My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. NOBLE COMPANY (WESTMINSTER AVENUE REHABILITATION FROM NEWHOPE ST TO HARBOR BLVD)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
R.J. NOBLE COMPANY (WESTMINSTER AVENUE REHABILITATION FROM NEWHOPE ST TO HARBOR BLVD)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 11:28:03 AM
Creation date
11/6/2023 1:46:49 PM
Metadata
Fields
Template:
Contracts
Company Name
R.J. NOBLE COMPANY
Contract #
22-6989
Agency
Public Works
Council Approval Date
9/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6989 <br />WESTMINSTER AVENUE REHABILITATION <br />FROM NEWHOPE ST TO HARBOR BLVD <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Adjust Water Vault Frame and <br />1 <br />EA <br />S <br />S <br />Cover Per CSA STD. <br />8,800.00 <br />8,800.00 <br />15 <br />Adjust Water Meter Frame and <br />6 <br />EA <br />S <br />$ <br />Cover Per CSA STD. <br />1,100.00 <br />6,600.00 <br />16 <br />Parkway Culvert Type B <br />2 <br />EA <br />S <br />S <br />8,050.00 <br />16,100.00 <br />17 <br />Adjust Manhole Frame and Cover <br />23 <br />EA <br />$ <br />S <br />Per CSA STD. <br />1,460.00 <br />33,580.00 <br />18 <br />Adjust Manhole Frame and Cover <br />2 <br />EA <br />S <br />$ <br />Per GG STD, <br />1,460.00 <br />2,920.00 <br />19 <br />Adjust Manhole Fume and Cover <br />2 <br />EA <br />$ <br />$ <br />Per OCSD STD. <br />2,120.00 <br />4,240.00 <br />20 <br />Adjust Manhole Frame and Cover <br />3 <br />EA <br />$ <br />$ <br />Per OCFCD STD. <br />2,120.00 <br />6,360.00 <br />21 <br />Furnish and Install New Manhole <br />1 <br />EA <br />S <br />S <br />Per GG STD. <br />2,200.00 <br />2,200.00 <br />22 <br />Furnish and Install New #6 Pullbox <br />4 <br />EA <br />S <br />$ <br />1,320.00 <br />5,280.00 <br />23 <br />Adjust Survey Monument Frame <br />2 <br />EA <br />S <br />$ <br />and Cover <br />1,450.00 <br />2,900.00 <br />24 <br />Install FABCO CPS Unit <br />5 <br />EA <br />$ <br />S <br />4,659.60 <br />23,298.00 <br />25 <br />Catch Basin Top Slab <br />1 <br />EA <br />$ <br />S <br />Reconstruction <br />19,250.00 <br />19,250.00 <br />26 <br />Furnish and Install Traffic Loops <br />28 <br />EA <br />S <br />S <br />Type D t <br />358.00 <br />10,024.00 <br />27 <br />Furnish and Install Traffic Loops <br />56 <br />EA <br />$ <br />$ <br />Type E t <br />330.00 <br />18,480.00 <br />28 <br />Furnish and Install Traffic Loops <br />2 <br />EA <br />S <br />S <br />Type Q t • <br />360.00 <br />720.00 <br />29 <br />Project Advertisement Sign <br />1 <br />EA <br />S <br />S <br />1,100.000 <br />1,100.00 <br />30 <br />Signing and Striping <br />1 <br />LS <br />$ <br />121, 500.00 <br />$ <br />121, 500.00 <br />31 <br />As -Built Plans <br />1 <br />LS <br />$5,000 <br />S5,000 <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.