My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Agreements for On-Call Geotechnical Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
11/21/2023 Regular
>
Item 17 - Agreements for On-Call Geotechnical Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 3:33:56 PM
Creation date
11/29/2023 2:16:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
11/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOCON <br /><01V) <br />City of Santa Ana <br />RFP 23-123 — On -Call Geotechnical Engineering Services <br />• Test designated construction materials for compliance with project plans and specifications. <br />Geocon will provide materials testing through our accredited in-house quality assurance testing laboratory. <br />• Report all work observed on a daily basis and report material test results immediately upon <br />completion of testing. Geocon provides daily field reports to all requesting parties at the end of each day <br />on -site, and at the completion of the project in a compiled report. <br />• Promptly prepare and submit written reports documenting all geotechnical/materials testing and <br />inspection services performed. Geocon's reporting process includes all findings and documentation <br />incurred during all services performed a minimum of 24 hours or sooner if necessary. <br />• Advise the City as to the acceptability of materials tested and inspected. Geocon considered by many <br />as a trusted advisor, we will always be available to the City, regardless of project assignment to answer any <br />questions or to advise on what to do in the event of failure in materials tested and/or inspected. We do not <br />charge for advice. <br />• Participate in final inspection of the project and advise City as to acceptability of work performed by <br />construction contract. To maintain consistency, Geocon will provide a lead multi -certified inspector who will <br />participate in the final inspection of the assigned project, together we will advise the City as to the acceptability <br />of work performed by the construction team. <br />• Prepare final geotechnical report. Geocon will prepare a final geotechnical report for each geotechnical <br />investigation performed under this contract and will furnish said reports in a timely manner. <br />• Services shall be performed as requested by the City and shall conform to the contract documents, <br />Title 24 of the California Administrative Codes, Underwriter's Laboratories, American Society of <br />Testing and Materials, and other code authorities. Geocon is very familiar with local, state, federal, and <br />other code authority requirements. Our services will be performed to project and applicable code <br />specifications. We keep all our staff up to date on any changes that may occur in code requirements. <br />SCHEDULE/TIMELINE <br />In order to maintain project schedules and minimize delays, Geocon maintains regular communication with <br />clients throughout project durations. Our staff understands the importance of direct client communication <br />concerning the scope of work, project milestones, and project deliverables. It is important that Geocon has a <br />clear understanding of the project and client expectations before commencing work. Through advanced <br />planning and establishment of project milestones, potential impacts on the critical path are flagged early to <br />allow for contingency planning, which minimizes risks to the project including delays and budget overruns. <br />Geocon regularly completes projects on schedule and is conscious of the importance of timeliness during <br />report preparation and when responding to questions from the project team throughout the project duration. <br />Documents are provided to the project team in electronic (pdf) format to keep projects moving forward in an <br />expeditious manner. Our laboratory is staffed by seasoned technicians and is open 17 hours per day to <br />expedite laboratory results and complete reports ahead of schedule. Reports are typically sent electronically <br />via email and by hard copy via overnight mail once completed. This allows the project team more time to <br />complete their tasks while waiting for the final documents. <br />Our staff is accustomed to mobilizing on relatively short notices, provides deliverables in a timely manner, <br />and has proven its ability to provide services for multiple, large-scale projects concurrently while adhering to <br />project schedules. <br />Geocon 2023-333 Page 30 August 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.