Laserfiche WebLink
Kleinfelder's history of providing comprehensive client service using the system above delivers a full - <br />service solution to solve the City's needs. Kleinfelder's ability to provide multiple core services in-house <br />allows for an integrated and streamlined approach to project delivery. Our experience with municipalities <br />includes successfully managing and delivering on multiple on -call contracts and high -profile water, <br />wastewater, reservoir, roadway, bridge, and construction projects. We bring best practices learned from <br />previous on -call/ as -needed contracts, and the relevant diverse experience to successfully complete the <br />City's project requests. <br />We will utilize our four- step (planning, execution, monitoring, management) project delivery <br />approach as described above to successfully deliver the project/task orders on time and within <br />budget. Our history of project performance has been proven to the City of Santa Ana based on <br />our projects performed under the current on -call agreement. <br />Our knowledge of current codes and design guidelines is exemplary and includes American Water <br />Works, Caltrans, American Disabilities Act (ADA), City of Santa Ana Municipal Code (SAMC), and a wide <br />knowledge of professional standards of city, county, state, and federal guidelines. Kleinfelder also has an <br />extensive knowledge of micro station V8i for the use of plan development and the City's CAD standards, <br />resulting in a seamless integration of standards and development of plans for the City. <br />We also realize the importance of having available resources to maintain high levels of responsiveness. <br />Therefore, we have identified several additional internal resources and established key teaming <br />arrangements to ensure our team has the expertise and capacity to be responsive to the City's needs. In <br />the event a project requires additional support beyond the resources identified herein, we will tap into <br />Kleinfelder's more than 3,000 employees company wide. <br />The Kleinfelder Team brinas value to the Citv with theGe feature <br />• A responsive, experienced, and proven Project Manager, Dany Hanna, PE, who has a <br />successful history of working on complex and challenging projects <br />• A proven, comprehensive team of technical experts to service all aspects of the contract <br />• A Southern California -based team with vast local resources available and able to respond at a <br />moment's notice with an experienced approach, coupled with a broad bench of professionals <br />across the country for geotechnical consultation <br />• Assigned project managers with the availability and expertise appropriate to the designated <br />scope of work <br />• Extensive experience with Public Works projects, offering: <br />- In-house services, providing the City with consistency, efficiency, and exceptional <br />responsiveness throughout a project, as shown by being repeatedly selected for projects at <br />the John Wayne Airport described herein. <br />- The ability to coordinate multiple regulatory agencies on a single project. <br />- Intimate knowledge of California regulations related to Public Works projects. <br />- Pavement and roadway facilities design and rehabilitation expertise. Kleinfelder's <br />geotechnical group can assess surface distresses and subgrade deficiencies and recommend <br />appropriate and cost-effective rehabilitation measures. <br />- Trenchless technology using horizontal directional drilling or jack and bore methods used in <br />highly populated areas, intersections, and channel crossing, or when conventional cut and <br />cover is not an option. <br />LK ElNFELDER <br />ghl Peop,e. High, SW,;.n City of Santa Ana On -Call Professional Engineering Services - RFP No. 23-1231 Page 14 <br />