4. City of Industry On -Call Geotechnical and Environmental Engineering I City of Industry, CA
<br />Year Completed: 1993 — Ongoing I Client: City of Industry, Josh Nelson, City Engineer, 626.333.2211;
<br />jnelson@cityofindustry.org I Key Staff: Dany Hanna, PE, GE I Jeffery Waller, PE, GE I Eric Noel, PE, GE
<br />Kleinfelder has been providing geotechnical, environmental, and construction services to the City of
<br />Industry for the past 30 years. During this time, we have developed great relationships with their other
<br />consultants and the City of Industry's construction inspectors, which leads to efficient execution of
<br />projects.
<br />Kleinfelder provides the City of Industry with experienced engineers that evaluate each project to deliver
<br />the best solutions for the specific situation encountered. Our services have ranged from geotechnical and
<br />environmental consulting to complete construction observation and testing services for major roadway
<br />improvements, street rehabilitation, water reservoirs, and other municipal facilities including a landfill and
<br />hospital. More than 100 projects have been completed to date, including recent projects described
<br />below.
<br />In the last five years, Kleinfelder has supported the City of Industry for design and construction of
<br />improvements along streets of various sizes within the city. Services have included investigations for
<br />roadway widening, additions of bus turnouts, and roadway rehabilitation. Many of the projects have
<br />required geotechnical design enhancements such as geogrid, cement -treated subgrade, or other
<br />measures to reduce pavement section thickness, reduce the instances of utility conflict, and reduce
<br />project costs. Recently, we have been requested to provide recycled asphalt pavement
<br />recommendations to reduce waste and re -use most of the existing materials.
<br />CLIENT BENEFITS Examples of relevantprojects under this contract include the
<br />follow�na:
<br />✓ One -Stop Shop. We have Gale Avenue Pavement Evaluation: Evaluated the existing
<br />provided the City of Industry with condition of the asphalt concrete pavement and provided
<br />a range of in-house services over design recommendations for the rehabilitation of Gale Avenue,
<br />our 30-year relationship with the from 1400 feet west of Stoner Creek Road to 400 feet east of
<br />City, eliminating learning curve Coiner Court. Low strength subgrade soils and high traffic
<br />and saving time and costs. volumes resulted in a deep pavement section. Kleinfelder
<br />incorporated layers of geogrid within the subgrade soils and
<br />aggregate base section to reduce the thickness of the pavement section, reduce the impacts on shallow
<br />water lines. This approach reduced the project costs and shortened the project schedule.
<br />Arenth Avenue Reconstruction: Kleinfelder advanced geotechnical borings and test pits to provide the
<br />City of Industry with geotechnical recommendations for reconstruction of Arenth Avenue. The
<br />reconstruction design included optional recommendations for the overexcavation and recompaction of
<br />subgrade soil, placement of geogrid within the aggregate base, the use of cement -treated subgrade soil,
<br />placement of cement -treated base, and the placement of recycled asphalt pavement by the cold central
<br />plant method. Kleinfelder also performed observation and testing services during reconstruction of the
<br />pavement section to ensure that our geotechnical recommendations were incorporated into the project.
<br />5. On -Call Geotechnical and Environmental Services I City of Los Angeles, CA
<br />Year Completed: 1997 — Ongoing I Client: City of Los Angeles, Patrick Schmidt, Geotechnical
<br />Engineering Manager, 213.923.5984; patrick.schmidt@lacity.org I Key Staff: Dany Hanna, PE, GE
<br />Jeffery Waller, PE, GE I Eric Noel, PE, GE I Jeff Walker, PE, GE
<br />Kleinfelder has been the geotechnical engineer for numerous on -call contract task orders for new and
<br />existing facilities. The scope of work has ranged from slope stability and groundwater issues to complex
<br />geologic and geotechnical areas of faulting, natural methane, and other potential hazards. We have
<br />provided geotechnical services for reconstruction of fire stations, a vision theater, community
<br />development centers, bulkhead retaining walls, bridge reconstruction, parks, and sewer mains.
<br />LK E/NFELOER
<br />a 9h«p,e.p,9h,so,O;. City of Santa Ana On -Call Professional Engineering Services — RFP No. 23-123 1 Page 18