The Leighton Team
<br />We believe that having a dedicated team gives us the ability to be responsive and available when performing
<br />and completing services. Because of our vast experience, our project managers are able to anticipate and
<br />accommodate fluctuations in personnel needs before they affect your projects and tasks.
<br />Leading our team is Christian Delgadillo, PE, GE, who will serve as Project Manager and the primary point of
<br />contact to the City. Christian has more than 13 years of experience providing geotechnical engineering
<br />services in southern California, with an emphasis in serving cities and municipalities in Orange County.
<br />Christian will be supported by Djan Chandra, PE, GE, serving in the role of Principal in Charge and supporting
<br />Quality Assurance. With 35 years of experience, as well as direct experience working with the City of Santa
<br />Ana, Djan is a true expert of Geotechnical Engineering. This duo has successfully worked together on dozens
<br />of On -Call contracts for local public agencies and look forward to bringing this expertise to the City.
<br />Resumes for our complete and carefully selected project team, which includes the availability % for each
<br />member, are provided in the Appendix A at the end of this proposal.
<br />PROJECT MANAGER/PRINCIPAL AGENT I Will provide contract administration, senior oversight, and corporate
<br />coordination to ensure all Work Orders are adequately staffed and continuity is maintained. He will be directly
<br />responsible for the execution and results of scope of work.
<br />EDUCATION
<br />• MS, Civil Engineering
<br />• BS, Civil Engineering
<br />PROFESSIONAL LICENSE
<br />• CA Geotechnical Engineer
<br />- 3144
<br />• CA Civil Engineer - 83331
<br />YEARS OF EXPERIENCE
<br />• 13 total
<br />• 10 years w/firm
<br />OFFICE LOCATION
<br />Irvine
<br />Christian Delgadillo, PE, GE
<br />Associate Geotechnical Engineer
<br />• Experienced providing all the Geotechnical Engineering tasks
<br />listed in the RFP
<br />Experienced in geotechnical investigations, from the proposal
<br />stage through site investigation, testing, analysis and
<br />completion of reports, for various types of public works,
<br />transportation, governmental and utility projects
<br />• Areas of expertise include drilling and sampling of soil and rock using various
<br />techniques. in -situ permeability testing, field instrumentation, and interpretation of
<br />results from SPT, CPT, and geophysical surveys
<br />• Skilled in slope stability analysis, seismic hazard analysis, ground motion study,
<br />liquefaction analysis, deep and shallow foundation design, pavement design,
<br />retaining wall design, and other computer applications
<br />QUALITY ASSURANCE/PRINCIPAL IN CHARGE I Responsible for verifying that our deliverables meet project
<br />requirements and provide technical quality review of geotechnical reports. Understands the critical importance of timely,
<br />accurate, and fully vetted geotechnical information.
<br />EDUCATION
<br />• MS, Civil Engineering
<br />• BS, Civil Engineering
<br />PROFESSIONAL LICENSE
<br />• CA Geotechnical
<br />Engineer - 2376
<br />• CA Civil Engineer-
<br />50068
<br />YEARS OF EXPERIENCE
<br />• 35 years total
<br />• 35 years with firm
<br />OFFICE LOCATION
<br />Irvine
<br />Djan Chandra, PE, GE
<br />Principal in Charge / Quality Assurance
<br />• Vast experience in developing practical solutions for complex
<br />geologic conditions and geotechnical issues in Orange
<br />County
<br />• Extensive knowledge of geotechnical field investigative
<br />techniques, laboratory testing procedures, and field instrumentation
<br />• Expertise in computer software for geotechnical engineering applications,
<br />including FLAC and Plaxis
<br />• Project manager for multiple on -call contracts for various municipalities:
<br />- County of Orange, Public Works Department
<br />- Cities of Santa Ana, Anaheim, Huntington Beach, Irvine, Lake Forest,
<br />Mission Viejo, Newport Beach
<br />- Irvine Ranch Water District, Yorba Linda Water District, Moulton Niguel
<br />Water District
<br />
|