Laserfiche WebLink
Earth Mechanics, Inc. <br />Availability <br />EMI routinely serves municipal clients and Caltrans through on -call geotechnical contracts and <br />is fully aware of the need to provide services with short notice (sometimes within 24 hours) and <br />complete the assignment under a demanding schedule (one day turnaround). EMI has ample <br />resources to cover the anticipated workload including concurrent task orders, peak demands, <br />and expedited schedules. Table 1. Team/Staff Role, Availability and Qualifications <br />demonstrates that EMI has sufficient availability and relevant expertise to meet the needs of the <br />City. <br />Table 1. Team/Staff Role, Availability and Qualifications <br />U <br />— <br />3 <br />- <br />o_ <br />rn <br />— <br />o_ <br />_ <br />Name <br />Project Assignment <br />Availability <br />EYxper ea lent s of~ <br />T <br />c <br />c <br />.. <br />N W <br />C <br />Y <br />6 <br />U' <br />4.2 <br />= <br />p m <br />N <br />_ <br />o <br />- <br />m <br />S <br />— <br />_ <br />_ <br />u <br />N <br />— <br />`t <br />C7 <br />E <br />N <br />N <br />w <br />N <br />; <br />U O <br />r7 <br />a <br />0_' <br />iA <br />C7 <br />O <br />Alahesh Thurairajah, PE, GE, D.GE <br />Principal & QA/QC Reviewer <br />15% <br />14 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• • <br />• <br />• <br />Raj Pirathiviraj, PE, GE <br />Project Manager <br />80% <br />19 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• • <br />• <br />• <br />• • <br />• <br />• <br />• <br />• <br />Andy Korkos, PE, GE <br />Analyses/Report Preparation <br />70% <br />37 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• • <br />• <br />• <br />Mike Kapuskar, PE, GE <br />Analyses/Report Preparation <br />60% <br />35 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• • <br />• <br />• <br />Pratha Ragavan, PE <br />Analyses/Report Preparation <br />60% <br />6 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• • <br />• <br />Dane Nicklaus, PE <br />Analyses/Report Preparation <br />60% <br />g <br />♦ <br />• <br />Michael Hoshiyama, PG, CEG <br />ExploratiordConsir. Task Leader <br />70% <br />17 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />Wendy Drummond, PG, CEG <br />Geology <br />70% <br />33 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />Jianmin Fang <br />Lab Testing Task Leader <br />50% <br />33 <br />• <br />• <br />• <br />• <br />• <br />• <br />Tom Pongsakornpatara <br />Field Exploration/Analyses <br />75% <br />21 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />KiatKaekul <br />Construction Monitodng <br />50% <br />32 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />Thomas Fiestel, PG <br />Construction Monitoring <br />50% <br />5 <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />d. Understanding of Need <br />Project Understanding <br />EMI envisions that the process by which services will be provided will begin with an initial <br />request from the City's Project Manager. The City's Project Manager will provide specific <br />information regarding the project and proposed improvements including providing a plan <br />showing the location, limits, features, etc. of the proposed improvements. Once this information <br />is provided to EMI, a geotechnical scope of work and cost estimate for geotechnical services <br />can be developed and submitted to the City for review. After receiving notice to proceed (NTP), <br />EMI will begin the geotechnical work. <br />Proposal (RFP No. 23-123) City of Santa Ana <br />On -Call Geotechnical Engineering Services <br />