My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Agreements for On-Call Geotechnical Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
11/21/2023 Regular
>
Item 17 - Agreements for On-Call Geotechnical Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 3:33:56 PM
Creation date
11/29/2023 2:16:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
11/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />RFP 23-123 — On -Call Geotechnical Engineering Services <br />ACACIA AVENUE-JOSEPHINE STREET STORM DRAIN, GARDEN GROVE, CALIFORNIA <br />Geocon performed utility potholing services on Acacia Avenue and Josephine Street with the goal to fill the <br />cracks and separations of asphaltic pavement for the street improvement project in the City of Garden Grove. <br />We exposed utilities along the alignment of the proposed storm drain line, backfilled the excavations with <br />soils, and restored the ground with asphalt/concrete patches. Geocon matched the existing AC thickness to <br />that of surrounding streets upon completion of the storm drain. As the Project Manager and Senior Project <br />Engineer Ms. Adams, was responsible for scope of work development, oversight of field work, and preparation <br />of technical reports and letters. <br />OAK CREEK COMMUNITY PARK, IRVINE, CALIFORNIA <br />Geocon is currently performing a limited geotechnical investigation for the Oak Creek Community Park <br />improvements in the city of Irvine, California. The proposed improvements are anticipated to include new <br />natural turf on two existing soccer fields, a new lighted sand volleyball court, a new lighted full -court basketball <br />court, a new lighted dog park, a new natural turf field, and additional parking. Ms. Adams serves as the Project <br />Manager and provides quality control over all geotechnical reports and provides team management. <br />GREENSTREET PAVEMENT CORES, MISSION VIEJO, CALIFORNIA (A93408803) <br />Geocon provided a geotechnical pavement evaluation for the driveway approach off Marguerite Parkway for <br />the City of Mission Viejo. In our written letter report we confirmed the thickness of the asphalt and aggregate <br />base sections, in addition to the relative density and moisture content of the underlying subgrade. As our <br />senior engineer, Ms. Adams provided figure and table preparation as well as the letter report. <br />FIRE STATION NO.2 REPLACEMENT, NEWPORT BEACH, CALIFORNIA <br />As part of Geocon's On -Call Geotechnical Services Contract with the City of Newport Beach we are currently <br />providing soils and materials testing and observation services during grading and construction for the <br />replacement of the Lido Fire Station No. 2 on 32nd Street — built in 1953. In addition to Geocon's testing and <br />observation services we will also be providing geotechnical consultation, plan review, and design <br />recommendations for this project. Ms. Adams is serving as the Principal Engineer and Project Manager. <br />Los ANGELES COMMUNITY COLLEGE DISTRICT, PIERCE COLLEGE, EXPANDED AUTOMOTIVE & NEW <br />TECHNICAL EDUCATION FACILITIES <br />Geocon performed a third party peer review of the original geotechnical report prepared for the project and is <br />in the process of preparing an updated geotechnical investigation report for compliance with current California <br />Building Code, California Geological Survey, and Division of State Architect requirements. Ms. Adams <br />performed a ground motion hazard analyses and probabilistic seismic hazard analysis in conformance with <br />the 2013 California Building Code and ASCE 7-10. <br />Los ANGELES COMMUNITY COLLEGE DISTRICT, PIERCE COLLEGE, WEST CENTRAL PLANT EXPANSION <br />Geocon performed a third party peer review of the original geotechnical report prepared for the project and is <br />in the process of preparing an updated geotechnical investigation report for compliance with current California <br />Building Code, California Geological Survey, and Division of State Architect requirements. Ms. Adams <br />performed a ground motion hazard analyses and probabilistic seismic hazard analysis in conformance with <br />the 2013 California Building Code and ASCE 7-10. <br />Geocon 2023-333 Page 5 August 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.