My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Response to OC Grand Jury Report_ Historic Rain, Yet Drought
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
11/21/2023 Regular
>
Item 07 - Response to OC Grand Jury Report_ Historic Rain, Yet Drought
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 2:21:31 PM
Creation date
11/29/2023 2:21:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
11/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HISTORIC RAIN, YET DROUGHT REMAINS <br /> <br /> <br />ORANGE COUNTY GRAND JURY 2022 I 2023 Page 4 of 57 <br />Public awareness must be expanded to encourage better management of our water by <br />expediting the process for planning and construction of new water sources such as <br />desalination and prioritizing funding. <br />The Orange County Grand Jury recommends the creation of a “Climate Resiliency <br />District” to lessen the County’s dependence on State and regional water projects. Just <br />as Orange County supported Measure M and created the Orange County <br />Transportation Authority to solve the county’s transportation crisis, the same bold <br />leadership is needed to solve the county’s water crisis. <br />This report presents information about the current crisis in water planning, existing <br />projects to increase the supply of non-potable water for irrigation, and storage issues. <br />The report makes recommendations for a reliable source of potable water through <br />desalination of ocean water. <br />BACKGROUND <br />Water is our most precious resource, but due to shifts in climatic weather patterns, the <br />reliability of traditional water supplies is under intense pressure in Orange County. Many <br />water business insiders are stating privately that these systemic events are now at a <br />“crisis” stage, despite the recent precipitation. <br />To date, traditional water suppliers in Orange County have not addressed the <br />implications of this systemic shift. They have maximized local resources by recycling, <br />capturing flood water runoff, and finding new areas for storage. However, they have yet <br />to fully develop a transformational drought-resistant water resource outside the status <br />quo. <br />Numerous past Orange County Grand Jury reports1 have dealt with the internal <br />governance and organizational structure or the need for conservation efforts to <br />maximize water utilization. This report elaborates on the dependency on outside water <br />supplies such as the California Water Project and the Colorado River Basin that provide <br />over 50% of our county’s local water supply. South Orange County lacks a bountiful <br />aquifer that provides North and Central Orange County with 70% of its water supply.2 <br />South Orange County depends on imported water for 90% of its needs. These imported <br />water supplies are becoming less reliable, with annual reductions occurring in both the <br />California Water Project and the Colorado River Basin creating major disruptions. <br />Conservation measures have been put in place throughout Orange County to maximize <br />existing supplies to help mitigate these concerns. This is simply inadequate to resolve <br />the long-term supply issue. One of the ways to resolve this issue is desalination, a <br />proven alternative that has not yet been fully implemented in Orange County.
The URL can be used to link to this page
Your browser does not support the video tag.