My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (16)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 4:25:29 PM
Creation date
11/30/2023 4:24:03 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-2023-198
Agency
Police
Council Approval Date
11/7/2023
Expiration Date
6/30/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cal OES <br />OOVERNOR'S OFFICE <br />OF EMERGENCY SERVICES <br />Standard Assurances <br />For Cal OES Federal Non -Disaster Grant Programs <br />(b) All manufactured products used in the project are produced in the United <br />States - this means the manufactured product was manufactured in the <br />United States; and the cost of the components of the manufactured product <br />that are mined, produced, or manufactured in the United States is greater <br />than 55 percent of the total cost of all components of the manufactured <br />product, unless another standard for determining the minimum amount of <br />domestic content of the manufactured product has been established under <br />applicable law or regulation; and <br />(c) All construction materials are manufactured in the United States -this means <br />that all manufacturing processes for the construction material occurred in the <br />United States. <br />The "Buy America' preference only applies to articles, materials, and supplies that <br />are consumed in, incorporated into, or affixed to an infrastructure project. It does not <br />apply to tools, equipment, and supplies, such as temporary scaffolding, brought to <br />the construction site and removed at or before the completion of the infrastructure <br />project. Nor does a Buy America preference apply to equipment and furnishings, <br />such as movable chairs, desks, and portable computer equipment, that are used at <br />or within the finished infrastructure project but are not an integral part of the structure <br />or permanently affixed to the infrastructure project. <br />Per section 70914(c) of BABAA, FEMA may waive the application of a Buy America <br />preference under an infrastructure program in certain cases. <br />On July 1, 2022, OMB approved FEMA's General Applicability Public Interest Waiver of <br />the BABAA requirements to be effective for a period of six months, through January 1, <br />2023. Applicants will not be required to follow the BABAA requirements for FEMA <br />awards made, and any other funding FEMA obligates, during this waiver period. For <br />any new awards FEMA makes after January 1, 2023, as well as new funding FEMA <br />obligates to existing awards or through renewal awards where the new funding is <br />obligated after January 1, 2023, Applicants will be required to follow the BABAA <br />requirements unless another waiver is requested and approved. <br />Page 14 of 15 Initials <br />
The URL can be used to link to this page
Your browser does not support the video tag.