My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TOWO ENTERPRISE, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
TOWO ENTERPRISE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:13:20 PM
Creation date
12/1/2023 8:37:58 AM
Metadata
Fields
Template:
Contracts
Company Name
TOWO ENTERPRISE, INC.
Contract #
P 22-1405
Agency
Public Works
Council Approval Date
6/6/2023
Notes
SEE NOTICE OF COMPLIANCE FOR INSURANCE INFO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*:�:uM. <br />I190 <br />CITY OF SANTAANA ADDENDUM Na.: 1 <br />PROPOSAL <br />PROJECT NO.: 22-1405 <br />PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE I <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Towo Enterprise Inc <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit prices) or lump sums) set forth in the following <br />schedule: <br />Item <br />Description _ <br />Qty <br />Unit _ <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />150 <br />Cy <br />$ 120.00 <br />$18,000.00 <br />2 <br />AC Pavement <br />21 <br />TN <br />$ 300.00 <br />$ 6,300.00 <br />3 <br />Construct PCC Sidewalk (T=4") <br />788 <br />SF <br />$ 15.00 <br />$11 820.00 <br />per C.O.S.A. Std. Plan 1104* <br />4 <br />Construct PCC Cuib Ramp* <br />4900 <br />SF <br />$ 35.00 <br />$171,500.00 <br />5 <br />Construct PCC Curb and Gutter <br />512 <br />LF <br />$ 100.00 <br />$ 51 200.00 <br />(T)pe A-2-6)* <br />6 <br />Adjust Manhole Frame and Cover <br />1 <br />EA <br />$ 2,500.00 <br />$ 2, 500.00 <br />to Grade <br />7 <br />Adjust Water Valve Frame and <br />_ <br />I <br />EA <br />$ 1,600.00 <br />$ 1,500.00 <br />Cover to Grade <br />8 <br />_ <br />Construct Color Stamped <br />Concrete including rebar (T=8") <br />_ <br />_ 50 <br />SF <br />$ 100.00 <br />$ 5,000.00 <br />9 <br />Construct PCC Modified Rolled <br />Curb and Gutter <br />70 <br />LF <br />$ 100.00 <br />$ 7,000.00 <br />10 <br />Signing and Striping <br />1 <br />LS <br />$ 10,000.00 <br />$10,000.00 <br />11 <br />Furnish & Install Complete <br />1 <br />LS <br />$ 20,000.00 <br />r$20,000.00 <br />Functioning Carmanah RRFB <br />12 <br />Project Advertising Sign(s) <br />2 <br />EA <br />$ 1,500.00 <br />$ 3,000.00 <br />13 <br />As -Built Plans <br />1 <br />LS <br />$5,000 <br />$ 5,000.00 <br />P-1 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.