My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARDY & HARPER, INC. (13)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
HARDY & HARPER, INC. (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 2:30:33 PM
Creation date
12/1/2023 8:39:32 AM
Metadata
Fields
Template:
Contracts
Company Name
HARDY & HARPER, INC.
Contract #
P 23-6034
Agency
Public Works
Council Approval Date
9/19/2023
Notes
SEE NOTICE OF COMPLIANCE FOR INSURANCE INFO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBITA <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6034 <br />TRAFFIC CALMING IMPROVEMENTS PHASE I <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Hardy & Harper, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Remove and Construct PCC <br />630 <br />SF <br />$ <br />$ <br />Sidewalk (T-4") <br />25. o0 <br />15," 750 <br />2 <br />Construct PCC Curb Ramp <br />525 <br />SF <br />$ <br />$ <br />tIp.DD <br />Zl,trali <br />3 <br />Remove Piro Hydrant Assembly <br />3 <br />EA <br />$ <br />$ <br />12,ODO.cD <br />ao'o d <br />4 <br />Potholing (As -Needed)* <br />6 <br />EA <br />$ <br />$ <br />$CO • oo <br />4 , %co <br />5 <br />Vertical Offset (As -Needed)* <br />3 <br />EA <br />$ <br />$ <br />5, 5co . oo <br />10,500 <br />6 <br />Construct New Fire Hydrant <br />3 <br />EA <br />$ <br />$ <br />Assembly <br />2.5aD0o.co <br />'75,0o0 <br />7 <br />Install Raised Crosswalk at Adams <br />1 <br />LS <br />$ <br />- <br />$-St and Artesia St <br />101000. oo <br />IU, 000 <br />8 <br />Install Raised Crosswalk at Adams <br />I <br />LS <br />$ <br />$ <br />St and Spruce St <br />I p, 000. oo <br />10,000 <br />9 <br />Install Speed Cushions at <br />I <br />LS <br />$ <br />$ <br />Grovemont St Between Tustin Ave <br />1r� p0O , DD <br />15, p00 <br />and Deodar St <br />10 <br />Install Speed Cushions at Cypress <br />I <br />LS <br />$ <br />$ <br />Ave Between Edinger Ave and St <br />25, OOo 00 <br />2-5, 000 <br />Andrew PI <br />1 I <br />Install Speed Cushions at Myrtle St <br />I <br />LS <br />$ <br />$ <br />Between Rain St and Bristol St <br />20,000. uD <br />20, 000 <br />12 <br />Signing and Striping <br />I <br />LS <br />$ <br />$ <br />2(o2,q50.oD <br />2.w,450. <br />13 <br />Furnish & Install Complete <br />1 <br />LS <br />$ <br />$ <br />Functioning Carmanah RRFB <br />System per Plan at the Intersection <br />z0, 000,. pp <br />20, Opp <br />of Civic Center Dr and French St <br />P-I ofP-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.