My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Amend Agreement for Memorial Park and Aquatics Facility Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/05/2023 Regular & HA
>
Item 07 - Amend Agreement for Memorial Park and Aquatics Facility Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:45:18 PM
Creation date
12/1/2023 3:12:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
7
Date
12/5/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amend Agreement for Memorial Park and Aquatics Facility Renovation <br />December 5, 2023 <br />Page 2 <br />GOVERNMENT CODE 484308 APPLIES: Yes <br />DISCUSSION <br />Memorial Park, dedicated in May 1950, is a 16.3 acre city park located in the central - <br />south area of the City of Santa Ana. Both the community center and pool are original to <br />the park and were installed in 1956. These facilities are old and deteriorated, preventing <br />routine maintenance and renovations from being effective. Additionally, the floor plan <br />layout no longer meets today's programming needs. <br />On August 15, 2023, City Council awarded an agreement to ELS Architecture and <br />Urban Design for architectural design services for the Memorial Park and Aquatics <br />Facility Renovation. At that time, the contract amount was based on the total available <br />project funding of $10 million. <br />During concept planning, the consultant advised that the cost of rebuilding the aquatics <br />building and a 50-meter pool would far exceed the budget due to cost escalation, <br />increased labor costs, unpredictable market conditions, and a recommended <br />consideration of an alternative two -pool option. This alternative has additional benefits <br />for both programmatic and budgetary reasons. Acting on the two -pool option would <br />serve a larger audience as it includes both a 25-yard competitive pool and a family pool. <br />A two -pool option would also be phased, enabling the project to be partially completed <br />within the existing budget. <br />After an extensive community outreach effort, including the Memorial Park <br />Neighborhood Association and five schools that serve the Memorial Park community, <br />the two -pool concept was overwhelmingly supported by the community. Staff <br />recommends that the two pool concept be fully designed for construction. This <br />recommendation comes with the support of the community. The estimated cost for a <br />new aquatics facility, which includes a new building and the two pools is $22 million. <br />Staff recommends amending the consultant's contract to include this additional scope of <br />work and move forward with development of plans and specifications of the aquatics <br />facility project (Exhibit 1). <br />FISCAL IMPACT <br />Funds are budgeted and available for expenditure in the Fiscal Year 2023-24. Any <br />remaining balances not expended at the end of the fiscal year will be presented to City <br />Council for approval of carryovers to FY 2024-25. The table below indicates the estimated <br />expenditures by fiscal year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.