My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-12-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Agenda Packet_2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 3:21:51 PM
Creation date
12/14/2023 3:18:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
12/19/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID PROPOSAL <br />CITY OF SANT A ANA <br />PROPOSAL <br />PROJECT NO.: 22-1387 <br />ARPA NEIGHBORHOOD STREETLIGHTS-PHASE I <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: Elecnor Belco Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item Description Qty Unit Unit Price Amount <br />1 Install Street Light Pole 35 EA $ $ ,;-rso 270/ca30 <br />2 Install Electrical Meter Pedestal 4 EA $ $ \0/ l�4 L\0/50� <br />3 *Install 3#8 A WG Conductor 5200 LF $ $ Wires 1-��o<o,22-O <br />4 *Install 2" PVC Conduit 5000 LF $ $ so 2-so ... cco <br />5 *Install 3" PVC Conduit 60 LF $ 60 $ ½,BC:O <br />6 *Install No. 3 ½ Pull Box 6 EA $ $ (o7}6 ��2<c I <br />7 Install No. 5 Pull Box 4 EA $ $ s�i 3 ... SS2 <br />8 *Remove and Replace Concrete 60 SF $ $ Pad ss 3,300 <br />9 Pothole Street Light Pole Location 35 EA $ $ 92i 02/Y<co <br />10 Pothole Utilities Not Shown On 5 EA $92B $ Plan l.j,�t.\O <br />11 Install #6-6 Aluminum Duplex 400 LF $ $ Overhead Cable l<o 7,.200 <br />12 Remove Street Light Pole 1 EA $ 2,soc $ 2/600 <br />13 CCTV Inspection of Existing 1 LS $ $ Sewer Main and Laterals (Pre and 8,Soo 8)5CXOPost Construction) <br />14 Construction Permit 1 LS $6,000 $6,000 <br />P-1 of P-26 <br />EXHIBIT A <br /> <br /> <br />City Council 19 – 57 12/19/2023
The URL can be used to link to this page
Your browser does not support the video tag.