My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-12-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Agenda Packet_2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 3:21:51 PM
Creation date
12/14/2023 3:18:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
12/19/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANT A ANA <br />PROPOSAL <br />PROJECT NO.: 22-1406 <br />ADDENDUM NO. 1 <br />PROJECT 22-1406 <br />PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE II -ARPA I CSLFRF <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANT A ANA <br />FROM: Elecnor Belco Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item Description Qty Unit Unit Price Amount <br />1 Pedestrian Hybrid Beacon I LS $ $ Installation at Flower St and 3rd St �'o.,°'4{o Z�S,Cf� <br />2 Pedestrian Hybrid Beacon I LS $ $ Installation at Susan St and 5th St 2 \ 'e, ,000 2.lS,000 <br />3 Traffic Signal Installation at I LS $ $ Fairview St and Highland St �z,,;�5 �o2.,')'-<S <br />4 Install Video Detection System at I EA $ $ Flower St and 3rd St Z\fo5'-< 'Z.l,'-5<-i <br />5 Install Video Detection System at 1 EA $ $ Susan St and 5th St 2-\,�5'-l 2-\,"",'1 <br />6 Install Video Detection System at I EA $ $ Fairview St and Highland St 61 r 'flt, °67,9li <br />7 Install APS System at Flower St I LS $ $ and 3rd St lct,3°'2> lC\,�c:% <br />8 Install APS System at Susan St and I LS $ $ 5th St te>,q,e \.D,q78 <br />9 Install APS System at Fairview St I LS $ $ and Highland St 20,oiz.. z.o,6SZ.. <br />10 Install GTT Opticom EVP System I LS $ $ at Fairview St & Highland St 1-Z., '-{ 2.Z.... l2,4ZZ- <br />11 Install 3" PVC Conduit per Plan 1560 LF $7S $\\1,(X:J) <br />12 Install 4" PVC Conduit per Plan 1500 LF $ 85 $\27,SOO <br />13 Install No. 5 Pull Box 4 EA $8'20 $3,520 <br />14 Install No. 6 Pull Box 20 EA $ 9Zo $ l�,400 <br />15 Install No. 6E Pull Box 8 EA $ I, I 'Z-S $ 'l,000 <br />16 Install CCTV and IP l LS $ $ Communication Systems at 2-'-1,C,t;3 2-'-l.,Co':>3 Fairview St and Highland St <br />P-1 of P-28 <br /> <br /> <br />City Council 20 – 6 12/19/2023
The URL can be used to link to this page
Your browser does not support the video tag.