My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Bikeway and Safe Routes to School Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Item 13 - Bikeway and Safe Routes to School Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 3:45:59 PM
Creation date
12/14/2023 3:31:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
13
Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Project improvements include: Wheelchair ramps, sidewalk, traffic <br />signal, left turn arrow, curb extensions, high visibility crosswalks, <br />and streetlights. <br />PROJECT NEED: <br />Pedestrian and bicycle traffic safety Improvements for school age <br />pedestrians. <br />PROJECT TITLE: <br />Jackson Elementary and Diamond <br />Elementary SRTS <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Safety / Mobility <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works Design Engineering Zdenek Kekula, Principal Civil Engineer 12-Dec-2023 <br />PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction ---7,312,000 --- <br />Engineering -850,000 ----- <br />Environmental 100,000 ------ <br />TOTAL 100,000 850,000 -7,312,000 --- <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />ATP 100,000 850,000 -7,312,000 --- <br />TOTAL 100,000 850,000 -7,312,000 --- <br />EXHIBIT 5
The URL can be used to link to this page
Your browser does not support the video tag.