My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Award Construction Contract to Elecnor Belco Electric, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Item 19 - Award Construction Contract to Elecnor Belco Electric, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 1:49:45 PM
Creation date
12/14/2023 3:32:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-1387 <br />ARPA NEIGHBORHOOD STREETLIGHTS — PHASE I <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Elecnor Belco Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Install Street Light Pole <br />35 <br />EA <br />$ <br />$ <br />1-73(6 <br />2-7o,1830 <br />2 <br />Install Electrical Meter Pedestal <br />4 <br />EA <br />$ <br />$ <br />k0, t34 <br />y0,S36 <br />3 <br />*Install 3#8 AWG Conductor <br />5200 <br />LF <br />$ <br />$ <br />Wires <br />-7-35 <br />3z,7Z0 <br />4 <br />*Install 2" PVC Conduit <br />5000 <br />LF <br />$ <br />$ <br />SO <br />ZSO, Oo0 <br />5 <br />*Install 3" PVC Conduit <br />60 <br />LF <br />$ <br />$1 <br />8 <br />6 <br />*Install No. 3 '/2 Pull Box <br />6 <br />EA <br />$ <br />$ <br />�3$ <br />3,a2a <br />7 <br />Install No. 5 Pull Box <br />4 <br />EA <br />$ <br />$ <br />8�$ <br />3,SS2 <br />8 <br />*Remove and Replace Concrete <br />60 <br />SF <br />$ <br />$ <br />Pad <br />3,300 <br />9 <br />Pothole Street Light Pole Location <br />35 <br />EA <br />$ <br />$ <br />92$ <br />3Z,9(80 <br />10EInstall <br />Utilities Not Shown On <br />5 <br />EA <br />$ <br />Q28 <br />$ <br />y,(L10 <br />116-6 <br />Aluminum Duplex <br />400 <br />LF <br />$ <br />$d <br />Cable <br />18 <br />7'zoo <br />12 <br />Remove Street Light Pole <br />1 <br />EA <br />$z �O0 <br />i <br />$ <br />. U) <br />5 <br />13 <br />CCTV Inspection of Existing <br />1 <br />LS <br />$ <br />$ <br />Sewer Main and Laterals (Pre and <br />p <br />O <br />S i Sc)c <br />Post Construction <br />LS <br />$ 6,000 <br />14 <br />Construction Permit <br />1 <br />$ 6,000 <br />P-1 of P-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.