My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Pedestrian and Mobility Improvements Phase II
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Item 20 - Pedestrian and Mobility Improvements Phase II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 1:50:08 PM
Creation date
12/14/2023 3:32:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 5 <br />PROJECT TITLE: <br />Pedestrian & Mobility Improvements <br />Phase 11 <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Improvements <br />LOCATION MAP !� <br />N <br />CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Project improvements include: Traffic signal, pedestrian hybrid <br />beacons, traffic circle, wheelchair ramps, sidewalk, curb extensions, <br />and high visibility crosswalks. <br />PROJECT NEED: <br />Pedestrian and bicycle traffic safety Improvements for pedestrians. <br />PROJECT COSTS FY 23124 FY 24125 FY 25126 FY 26127 FY 27128 FY 28129 FY 29130 <br />Construction 2,100,300 - - - - - - <br />Contingency 180,000 <br />Engineering 120,000 <br />TOTAL 2,400,300 <br />SOURCE OF FUNDS FY 23124 FY 24125 FY 25126 FY 26127 FY 27128 FY 28129 FY 29130 <br />ARPA Funds 2,400,300 - - - - - - <br />TOTAL 2,400,300 <br />AGENCY: DIVISION: CONTACT: <br />Public Works Traffic Engineering Cesar Rodriguez, Senior Civil Engineer <br />DATE: <br />29-Nov-2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.