My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (KING ST. URBAN GREENING)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
C.S. LEGACY CONSTRUCTION, INC. (KING ST. URBAN GREENING)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 10:17:55 AM
Creation date
1/2/2024 3:05:34 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC. (KING ST. URBAN GREENING)
Contract #
P 23-6625
Agency
Public Works
Council Approval Date
10/17/2023
Notes
SEE NOTICE OF COMPLIANCE FOR INSURANCE INFO.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />:11___>Rcll►yclaf-1_tc]4 W <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 23-6625; King Street Urban Greening Change Order Number <br />To C.S. Legacy Construction, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. To compensate the contractor for the removal of trees conflicting with new block wall per PCO#02 <br />dated December 11. 2023. <br />AGREED PRICE = $14,903.17 <br />2. To compensate the contractor for the water main abandonment on King Street per PCO#03 dated <br />March 7, 2024. <br />AGREED PRICE = $23,456.37 <br />3. To compensate the contractor for repairs of the South end of the West CMU wall per PCO#04 <br />dated February 8,2024. <br />AGREED PRICE = $2,318.09 <br />4. To compensate the contractor to substitute full depth asphalt replacement with a 2" grind/overlay <br />at Fairview St and 91 Street and replace the PCC cross -gutter per PCO#05 dated February 13, <br />2024. <br />AGREED PRICE = $12,407.29 <br />5. To compensate the contractor to place an additional 2" of stucco on the wall cap to facilitate a <br />continuous mural per PCO#06 dated February 14, 2024. <br />AGREED PRICE = $1,494.32 <br />6. To compensate the contractor for extra 10 sq-ft of the Artist mural per PCO#07 dated February <br />20, 2024. <br />AGREED PRICE = $499.95 <br />7. To compensate the contractor for relocating light poles 1' away from the 2222 W 1 Oth St. property <br />line and 1' away from the Artist mural per PCO#08 dated April 5, 2024. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.