Laserfiche WebLink
TABLE OF CONTENTS <br />SECTION <br />1. CONTRACT REQUIREMENTS <br />1.1 <br />Independent Contractor <br />1.2 <br />Contract Transition <br />1.2.1 Transition In <br />1.2.2 Transition Out <br />1.3 <br />Hours and Days of Maintenance Services <br />1.3.1 Scheduling of Operations <br />1.3.2 Service Schedules <br />1.4 <br />Non -Interference <br />1.5 <br />Consumable Materials and Supplies — Contractor -Supplied <br />1.6 <br />Consumable Materials and Supplies — City -Supplied <br />2. RESPONSIBILITIES OF THE CONTRACTOR <br />2.1 <br />Inquiries and Complaints <br />2.2 <br />Safety <br />2.3 <br />Vehicles and Equipment <br />2.4 <br />Locks and Keys <br />2.5 <br />Service Yard and Storage Area(s) <br />2.6 <br />Utilities <br />2.7 <br />Traffic Control <br />2.8 <br />Bloodborne Pathogens and Biohazardous Material <br />2.9 <br />Accident Reporting and Site Securing <br />2.10 <br />Vandalism <br />2.11 <br />Cooperation / Collateral Work <br />2.12 <br />Protection of Existing Facilities and Structures <br />