My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - New Traffic Signal Installation at Chestnut Avenue and Zoo Lane (Formerly Elk Lane)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
01/16/2024 Regular & Special HA & Special SA
>
Item 10 - New Traffic Signal Installation at Chestnut Avenue and Zoo Lane (Formerly Elk Lane)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 9:02:45 AM
Creation date
1/17/2024 4:39:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
10
Date
1/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6999 <br />TRAFFIC SIGNAL INSTALLATION AT CHESTNUT AVENUE AND ELK LANE <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Baker Electric & Renewables LLC <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Installation at <br />Chestnut Ave and Elk Ln <br />I <br />LS <br />$ <br />$ <br />2 <br />Install Video Detection System <br />1 <br />LS <br />$ <br />$ <br />3 <br />Install GTT Opticom GPS EVP <br />System <br />1 <br />LS <br />$ <br />$ <br />4 <br />Install 2" PVC per plan <br />50 <br />LF <br />$ <br />$ <br />5 <br />Install 3" PVC per plan * <br />2350 <br />LF <br />$ <br />$ <br />6 <br />Install 4" PVC per plan <br />350 <br />LF <br />$ <br />$ <br />7 <br />No. 6 Pull Box <br />12 <br />EA <br />$ <br />$ <br />8 <br />No. 6E Pull Box <br />5 <br />EA <br />$ <br />$ <br />9 <br />SCE Pull Box <br />I <br />EA <br />$ <br />$ <br />10 <br />144 Strand SMFO * <br />2800 <br />LF <br />$ <br />$ <br />11 <br />12 Strand SWO <br />150 <br />LF <br />$ <br />$ <br />12 <br />Install IP Communication System at <br />Chestnut Ave & Elk Ln <br />1 <br />LS <br />$ <br />$ <br />13 <br />Install IP Communication System at <br />Chestnut Ave & Lyon St <br />1 <br />LS <br />$ <br />$ <br />P-1 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.