My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - OC Streetcar Operations and Maintenance Cooperative Agreement
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
01/16/2024 Regular & Special HA & Special SA
>
Item 11 - OC Streetcar Operations and Maintenance Cooperative Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 9:04:04 AM
Creation date
1/17/2024 4:40:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
1/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-3-2323 <br />EXHIBIT C <br />Table C-1 Maintenance Responsibilities <br />Responsibility <br />Subject <br />AUTHORITY <br />I CITY <br />Islands at end of Platforms <br />X <br />Trimming of trees for clearance from OCS <br />See Exhibit C Section 3.3 <br />Structures <br />Westminster Avenue Bridge (abutments, columns, <br />X <br />deck, superstructure, approach walls, railings) <br />Santa Ana River Bridge (abutments, columns, deck, <br />X <br />superstructure, approach walls, railings) <br />Graffiti <br />Graffiti removal (all items listed as CITY <br />X <br />responsibility unless listed otherwise herein) <br />Graffiti removal on Westminster Bridge abutment <br />and column in center of Westminster Avenue not <br />X <br />requiring climbing or ladders. <br />Graffiti removal (all items listed as AUTHORITY <br />X <br />responsibility unless listed otherwise herein) <br />Santa Ana Regional Transportation Center (only within OC Streetcar System <br />Property as defined in SARTC Agreement) <br />Curb and gutter north of AUTHORITY's traction <br />X <br />power substation <br />Driveway pavement at south end of Platform area <br />X <br />and north end of traction power substation area <br />Sidewalk and curb and gutter at south end of <br />X <br />Platform area adjacent to SARTC driveway <br />All elements in shaded area in Figure C-1 including <br />X <br />fencing as designed along border of shaded areas <br />Miscellaneous <br />Utility frame and covers located within track slab <br />including sewer and water system frames, covers <br />X <br />and concrete collars <br />3.3 Trees and Shrubs <br />The Parties agree to a criterion that tree limbs, branches leaves or palm fronds or shrubs, or <br />portions thereof, may not be closer than two (2) feet of any OCS wire or OCS bracket, the Streetcar or <br />Streetcar pantograph. <br />Exhibit C <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.