Laserfiche WebLink
Logistics <br />G3 complete Project #1 based on the Client's approval. <br />Project Deliverables <br />Item 1. Draft Conceptual Design <br />Item 2. Revisions/Comments <br />Item 3. Final Design <br />Item 4. Order Plants (coordinate with G3) <br />Item 5. Sod Removal (by others) <br />Item 6. Hardscape install (by others) <br />Item 7. Irrigation plumbing and irrigation laterals (by others) <br />Item 8. Site prep (by others) <br />Item 9. Hands on Workshop 1—Soil and Rainwater Capture <br />Prep for HOW #2 (by others) <br />Item 10. Hands on Workshop 2 — Planting and Irrigation <br />Construction completion (by others) <br />Item 11. Final walk thru — with City Staff <br />Item 12. Maintenance Workshop <br />3 1 P a g e <br />