Laserfiche WebLink
Vista Heritage Charter School (601 North Fairview Street) <br />January 16, 2024 <br />Page 11 <br />or eliminate these impacts. Pursuant to Section 15183(i)(2) of the CEQA Guidelines, a <br />project is consistent with the GPU if the development density does not exceed what was <br />contemplated and analyzed for the parcel(s) in the certified GPU EIR and complies with <br />the associated standards applicable to that development density. Development density <br />standards can include the number of dwelling units per acre, the number of people in a <br />given area, floor area ratio (FAR), and other measures of building intensity, building <br />height, size limitations, and use restrictions. <br />The GPU identifies that the Interim Development Standard for the FLEX-1.5 area are <br />those development standards outlined for the M1 zoning designation. The M1 zone <br />provides for a variety of light industrial uses, including warehousing, manufacture, <br />assembly, machine shops, wholesale businesses, and ancillary uses such as office <br />uses that do not exceed thirty (30) percent of the gross floor area. The Project would <br />result in a FAR of 0.14, which is within the projections of the GPU EIR, which evaluated <br />a density of 1.5 FAR on the site. The GPU EIR adequately anticipated and analyzed the <br />impacts of this Project, identified applicable mitigation measures necessary to reduce <br />impacts of the Project, and the Project implements the applicable mitigation measures. <br />The Project, therefore, qualifies for an exemption from additional environmental review <br />as set forth in State CEQA Guidelines Section 15183. The full exemption analysis is <br />provided as Exhibit 7 of this report. Based on this analysis, a Notice of Exemption, <br />Environmental Review No. 2023-40 will be filed for this project. <br />ECONOMIC AND FISCAL IMPACTS <br />To date, the proposed project has generated a total of 156 temporary employment <br />opportunities, including environmental engineers, environmental remediation <br />technicians, demolition crew, architects, engineers, development consultants, and an <br />attorney. Additionally, the new administrative office will create ten permanent <br />employment positions. Moreover, the applicant will pay approximately $46,235 in <br />entitlement, plan check, and permit fees. <br />There is no fiscal impact associated with this action. <br />EXHIBIT(S) <br />1. Amendment Application Ordinance <br />2. Zoning Ordinance Amendment Ordinance <br />3. Vicinity Zoning and Aerial Map <br />4. Site Photo <br />5. Full Project Plans <br />6. Renderings <br />7. Environmental Analysis and Exemption <br />8. Community Meetings Documents <br />9. Parcel Map in Recording No. 86-284222 <br />10. Planning Commission Agenda Packet with Public Comments <br />City Council 26 —11 1/16/2024 <br />