Laserfiche WebLink
Vista Charter Public Schools District Office and Outdoor Space Project <br />CEQA Exemption 15183 <br />Plan Update. Additionally, the project would be consistent with applicable General Plan Update <br />Land Use Element policies as detailed in Table 5. Overall, the project would be consistent with <br />Criterion A. <br />b) There are no project specific effects which are peculiar to the project or its site. <br />The project site is located within the Fairview Business Park in an industrial area of Santa Ana. <br />The Fairview Business Park is currently developed with institutional (Vista Heritage Global <br />Academy and Templo Calvario Church), industrial, and office uses. As stated, the site's FLEX- <br />1.5 land use designation is intended to provide context -appropriate development in areas with <br />existing industrial uses. The proposed Vista Charter Public Schools district office and outdoor <br />open space areas would complement and serve the existing Vista Heritage Global Academy <br />located adjacent to the site's southern boundary. Additionally, upon approval of the required Zone <br />Change and Zoning Ordinance Amendment, project development would be required to comply <br />with applicable standards for the SD-82 zone, which is consistent with the standards for Light <br />Industrial uses in Municipal Code Sections 41-473 through 41-481. As such, the proposed project <br />would not result in effects which are peculiar to the project or its site and the project would be <br />consistent with Criterion B. <br />c) There are no project specific impacts which the prior EIR failed to analyze as significant <br />effects. <br />The GPU EIR concluded that buildout of the General Plan Update would result in a total of <br />115,053 residential units and 72,967,816 square feet of non-residential development by 2045. <br />The proposed project, which is consistent with the General Plan Update, involves renovating an <br />existing 5,837-square foot building and developing outdoor open space areas on an <br />approximately 0.9-acre site. The project would meet the development density requirement for the <br />FLEX-1.5 designation and thus, was considered in the planned development of the General Plan <br />Update and would have similar or lesser significant impacts than analyzed in the GPU EIR. As <br />discussed in Section 4.0, there are no project specific impacts which the GPU EIR failed to <br />analyze as significant effects. The proposed project is consistent with Criterion C. <br />d) There are no potentially significant off -site and/or cumulative impacts which the prior EIR <br />failed to evaluate. <br />As stated, buildout of the proposed project is consistent with the General Plan Update and thus, <br />was considered in the GPU EIR analysis. No off -site improvements are proposed in the project <br />area and the size and nature of the project would not result in cumulatively considerable <br />environmental impacts. Overall, there are no potentially significant off -site and/or cumulative <br />impacts which the GPU EIR failed to evaluate. The project is consistent with Criterion D. <br />e) There is no substantial new information which results in more severe impacts than <br />anticipated by the prior EIR. <br />As discussed in Section 4.0, the proposed project would result in similar and/or lesser impacts <br />than the GPU EIR. There is no substantial new information which result in more severe impacts <br />than anticipated by the GPU EIR. Therefore, the proposed project is consistent with Criterion E. <br />As shown, the proposed project is consistent with Criteria A through E under CEQA Guidelines <br />Section 15183. As such, the proposed project qualifies for the CEQA exemption. <br />Dec i y ouncil 26 —119 1/16/20'2 e 59 <br />