My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Public Hearing Vista Heritage Charter School (601 North Fairview Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
01/16/2024 Regular & Special HA & Special SA
>
Item 26 - Public Hearing Vista Heritage Charter School (601 North Fairview Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 11:33:12 AM
Creation date
1/23/2024 11:31:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
26
Date
1/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
670
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(C) The GPU identifies that the Interim Development Standard for the FLEX-1.5 <br />area is M1. The M1 zone provides for a variety of light industrial uses, including <br />warehousing, manufacture, assembly, machine shops, wholesale businesses and <br />ancillary uses such as office uses that do not exceed thirty (30) percent of the gross floor <br />area. The Project would result in a FAR of 0.14, which is within the projections of the GPU <br />EIR, which evaluated a density of 1.5 FAR on the site. The GPU EIR adequately <br />anticipated and analyzed the impacts of this Project and identified applicable mitigation <br />measures necessary to reduce impacts of the Project, and the Project implements the <br />applicable mitigation measures. <br />(D) Specifically, the Project qualifies for the exemption because the following <br />findings can be made: <br />The Project is consistent with the development density established by existing <br />zoning, community plan or general plan policies for which an EIR was certified. <br />The Project would result in a FAR of 0.14, which is less than the maximum FAR of <br />1.5 allowable in the FLEX-1.5 designated area, which is the development density <br />established by the GPU and analyzed in the GPU EIR. The Project site has an <br />Interim Development Standard of M-1 (light Industrial zone). The M-1 zone does <br />not have density requirements. <br />2. There are no Project specific effects which are peculiar to the Project or its site, <br />and which the GPU EIR failed to analyze as significant effects. The subject <br />property is similar to other properties in the area, including its land use designation <br />and zoning. The property does not support any peculiar environmental features, <br />and the Project would not result in any peculiar effects. In addition, as explained <br />further in the prepared Exemption Checklist, project impacts were adequately <br />analyzed by the GPU EIR; and as detailed in the GPU EIR, development projects <br />pursuant to the GPU, such as the proposed Project, could result in potentially <br />significant impacts to air quality, greenhouse gas emissions, and noise. However, <br />applicable mitigation measures specified within the GPU EIR would reduce <br />potential impacts to a less than significant level. <br />3. There are no potentially significant off -site and/or cumulative impacts which the <br />GPU EIR failed to evaluate. The Project is consistent with the density and use <br />characteristics of the development considered by the GPU EIR and would <br />represent a small part of the growth that was forecast for build -out of the GPU. The <br />GPU EIR considered the incremental impacts of the Project, and as explained <br />further in the prepared Exemption Checklist, no potentially significant off -site or <br />cumulative impacts have been identified which were not previously evaluated. <br />4. There is no substantial new information which results in more severe impacts than <br />anticipated by the GPU EIR. As explained in the prepared Exemption <br />Checklist, no new information has been identified which would result in a <br />determination of a more severe impact than what had been anticipated by the GPU <br />EIR. <br />5. As explained in the prepared Exemption Checklist, the Project will undertake <br />feasible mitigation measures specified in the GPU EIR. These GPU EIR mitigation <br />Ordinance No. NS-XXXX <br />City Council 26 — 16 1/16/ 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.