My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (17)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 3:26:03 PM
Creation date
1/24/2024 9:55:49 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2024-002
Agency
Public Works
Council Approval Date
1/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-3-2323 <br /> EXHIBIT C <br /> Table C-1 Maintenance Responsibilities <br /> Responsibility <br /> Subject AUTHORITY CITY <br /> Islands at end of Platforms X <br /> Trimming of trees for clearance from OCS See Exhibit C Section 3.3 <br /> Structures <br /> Westminster Avenue Bridge (abutments, columns, X <br /> deck, superstructure, approach walls, railings) <br /> Santa Ana River Bridge (abutments, columns, deck, X <br /> superstructure, approach walls, railings) <br /> Graffiti <br /> Graffiti removal (all items listed as CITY X <br /> responsibility unless listed otherwise herein) <br /> Graffiti removal on Westminster Bridge abutment <br /> and column in center of Westminster Avenue not X <br /> requiring climbing or ladders. <br /> Graffiti removal (all items listed as AUTHORITY X <br /> responsibility unless listed otherwise herein) <br /> Santa Ana Regional Transportation Center(only within OC Streetcar System <br /> Property as defined in SARTC Agreement) <br /> Curb and gutter north of AUTHORITY's traction X <br /> power substation <br /> Driveway pavement at south end of Platform area X <br /> and north end of traction power substation area <br /> Sidewalk and curb and gutter at south end of X <br /> Platform area adjacent to SARTC driveway <br /> All elements in shaded area in Figure C-1 including X <br /> fencing as designed along border of shaded areas <br /> Miscellaneous <br /> Utility frame and covers located within track slab <br /> including sewer and water system frames, covers X <br /> and concrete collars <br /> 3.3 Trees and Shrubs <br /> The Parties agree to a criterion that tree limbs, branches leaves or palm fronds or shrubs, or <br /> portions thereof, may not be closer than two (2) feet of any OCS wire or OCS bracket, the Streetcar or <br /> Streetcar pantograph. <br /> Exhibit C <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.