My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOMINGUEZ GENERAL ENGINEERING, INC. (NE ANNEXATION WATER & SEWER MAIN IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
DOMINGUEZ GENERAL ENGINEERING, INC. (NE ANNEXATION WATER & SEWER MAIN IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:07:41 PM
Creation date
2/5/2024 4:39:11 PM
Metadata
Fields
Template:
Contracts
Company Name
DOMINGUEZ GENERAL ENGINEERING, INC.
Contract #
P 21-6453, 21-6619
Agency
Public Works
Council Approval Date
11/7/2023
Notes
SEE NOTICE OF COMPLIANCE FOR INSURANCE INFO.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM NO. FOUR <br /> PROPOSAL <br /> PROJECT NO.: 21-6453 &21-6619 <br /> NE ANNEXATION WATER& SEWER IMPROVEMENTS <br /> Item Description Qty Unit Unit Price Amount <br /> 14 8"DR-14 PVC Water Main per 2,000 LF $ $ <br /> detail on plans(includes trench, ,OD d <br /> bedding,backfill andpaving) ® o <br /> 15 12"DR-14 PVC Water Main per 265 LF $ $ <br /> detail on plans(includes trench, -?S70 Cl��-�S D <br /> bedding,backfill andpaving) <br /> *16 Vertical Offset per City Standard 5 EA $ $ <br /> Plan 1413B(As Needed) 0 OC® a-0 a 0 (Da <br /> *17 1"Air Vacuum and Release Valve 1 EA $ $ <br /> per City Standard Plan 1415 (As )0 0(2 0 to 00 O <br /> Needed) < < <br /> *18 Additional Potholing(As Needed) 10 EA $ $ <br /> �DC� S�DD U <br /> *19 Additional Trenching Costs to 200 LF $ $ <br /> Install Water Pipeline 18"-30" `J U Sj On d <br /> Deeper(Total 54"to 66"Cover) L <br /> (As-Needed) <br /> 20 1"Copper Water Service per City 51 EA $ $ <br /> Std. 1401 3 f 00 L) 1 5 3 Q 0 D D <br /> 21 2"Copper Water Service per City 2 EA $ $ <br /> Std. 1402 -1 O1 l7O D L l pl p o 0 <br /> 22 8"Resilient Wedge Gate Valve per 4 EA $ $ <br /> City Std. 1410 ?j� (71�� �� p O 0 <br /> 23 12"Resilient Wedge Gate Valve per 1 EA $ $ <br /> City Std. 1410 C-7 ()0 D ID O (D <br /> 1 <br /> 24 2"Blow off Assembly per City Std. 1 EA $ $ <br /> 1414 101 DDD (L) 000 <br /> 25 Fire Hydrant Assembly per City 8 EA $ $ <br /> Std. 1405 a-0, 0 O 0 16 D, v o O <br /> 26 8"SDR-26 PVC Sewer Main per 660 LF $ $ <br /> detail on plans(includes trench, LTH L) d�� 0 b <br /> bedding,backfill and paving) <br /> 27 4"SDR-26 PVC Sewer Lateral per 29 EA $ $ <br /> City Std. 1204 S7 Do 0 I LA S, CD O <br /> 28 48"Sewer Manhole per City Std. 4 EA $ $ <br /> 1201 (7D ® 0� pO'D <br /> 29 Remove Existing Manhole 1 EA $ $ <br /> Opp <br /> 30 CCTV Inspection of Existing Sewer 1,860 LF $ — $ <br /> Main(Pre and Post Construction) 5 S£sL7 <br /> i <br /> 31 CCTV Inspection of Existing Sewer 20 EA $ $ <br /> Laterals(Pre and Post Construction) <br /> 32 CCTV Inspection of New Sewer 660 LF $ $' <br /> Main s' <br /> P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.