My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHAMBERS GROUP
Clerk
>
Contracts / Agreements
>
C
>
CHAMBERS GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:25:51 PM
Creation date
2/7/2024 3:13:47 PM
Metadata
Fields
Template:
Contracts
Company Name
CHAMBERS GROUP
Contract #
A-2020-241-05
Agency
Planning & Building
Council Approval Date
12/1/2020
Expiration Date
11/30/2023
Insurance Exp Date
5/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ #20-100: Environmental and Planning Services CHAMBERS <br />City of Santa Ana GROUP <br />Air Quality, GHG, HRAs and Noise (Vista Environmental) <br />Vista Environmental will provide the following tasks for conducting an air quality analysis, GHG analysis, and noise <br />analysis for a project. The results of these studies would then be incorporated into the appropriate CEQA document, or <br />in a standalone report. These tasks may vary depending on the project to be analyzed. Vista Environmental is also <br />qualified to provide Energy and Health Risk Assessments (HRA)s if required for a project. A detailed scope will be <br />provided on project basis. <br />Air Quality <br />Vista Environmental will provide the following tasks: <br />• Evaluate and quantify regional criteria pollutant emissions associated with each project utilizing the CalEEMod. <br />• Model and construction assumptions provided bythe Applicant. Calculate worst -case emissions based on all construction <br />activities. Compare the proposed project's construction -related criteria pollutant emissions to the SCAB thresholds. If <br />significant emission levels are found to be created from construction activities, feasible mitigation will be developed and <br />quantified. <br />• Provide a qualitative analysis of the construction -related toxic air contaminant (TAC) impacts from the project and detail <br />how due to the limited duration of construction activities that the cancer and non -cancer risks would be less than <br />significant. <br />• Utilize the results of the above tasks to develop responses to each of the air quality related CEQA checklist questions. <br />GHG Analyses <br />Vista Environmental will provide the following tasks: <br />• Evaluate and quantify GHG emissions associated with construction activities for the proposed project through utilization <br />of the CalEEMod Model run used in the Air Quality Analysis. <br />• Provide a qualitative operational GHG emissions analysis that details if a project would generate only nominal vehicle <br />emissions associated with maintenance activities that would result in less than significant GHG emissions. <br />• Evaluate the GHG emissions calculated by CalEEMod for construction activities and compare to all applicable GHG <br />emissions thresholds including AB 32, SB 32, and SCAB GHG emissions thresholds. If necessary, develop mitigation to <br />ensure the proposed project will meet each applicable measure. <br />• Determine if the project would conflict with any applicable plan, policy or regulation of an agency adopted for the <br />purpose of reducing the emissions of GHGs <br />• Utilize the results of the above tasks to develop responses to each of the GHG related CEQA checklist questions. <br />HRA <br />The following summary includes the approach for preparing Health Risk Assessments by Vista Environmental. A detailed <br />scope will be provided on a Project basis. <br />• Quantify TAC emissions created from construction of the proposed Project through utilization of the same CaIEEMod <br />Model run for the Air Quality Analysis in order to obtain the PM10 exhaust emissions from off -road equipment as well <br />as to obtain the average daily truck trips during the duration of construction of the Project. Utilize the EMFAC2017 model <br />to calculate the PM10 exhaust emission rates from the construction trucks. <br />• Enter the construction -related TAC emission sources into the AERMOD model to calculate the TAC concentration levels <br />at the nearby homes. <br />• Quantify all sources of TAC emissions created from operation of the proposed Project that is anticipated to include diesel <br />exhaust emissions from the running and idling of diesel trucks and possible operation of backup diesel generators. Utilize <br />the Traffic Impact Analysis to quantify the number of truck trips and the PM10 exhaust emission factors. <br />• Enter the operations -related TAC emission sources into the AERMOD model to calculate the TAC concentration levels at <br />the nearby homes. <br />• Utilize the methodology described in the Air Toxics Hot Spots Program Risk Assessment Guidelines Guidance Manual for <br />Preparation of Health Risk Assessments (OEHHA Guidance), prepared by OEHHA, February 2015, to calculate the cancer <br />and non -cancer (acute and chronic risks) from TAC emissions created from both construction and operation of the <br />Project. <br />�!,Wklw 9 <br />Est <br />/I1 1979 www.chambersgroupinacom <br />
The URL can be used to link to this page
Your browser does not support the video tag.