Laserfiche WebLink
TABLE OF CONTENTS <br />SECTION <br />1. CONTRACT REQUIREMENTS <br />1.1 Independent Contractor <br />1.2 Contract Transition <br />1.2.1 <br />Transition In <br />1.2.2 <br />Transition Out <br />1.3 Hours and Days of Maintenance Services <br />1.3.1 <br />Scheduling of Operations <br />1.3.2 <br />Service Schedules <br />1.4 Non -Interference <br />1.5 Consumable Materials and Supplies — Contractor -Supplied <br />1.6 Consumable Materials and Supplies — City -Supplied <br />2. RESPONSIBILITIES OF THE CONTRACTOR <br />2.1 Inquiries and Complaints <br />2.2 Safety <br />2.3 Vehicles and Equipment <br />2.4 Locks and Keys <br />2.5 Service Yard and Storage Area(s) <br />2.6 Utilities <br />2.7 Traffic Control <br />2.8 Bloodborne Pathogens and Biohazardous Material <br />2.9 Accident Reporting and Site Securing <br />2.10 Vandalism <br />2.11 Cooperation / Collateral Work <br />2.12 Protection of Existing Facilities and Structures <br />