Laserfiche WebLink
finds that the contractor is disposing of trash from other contracts, the City will discontinue <br />this service for the contractor and the contractor will be required to pay for their own trash <br />service <br />5.2.2 The City will provide the refuse bins and pay the costs of the disposal, however, the <br />contractor shall dispose of all trash, litter, and debris collected (i.e. refuse) by Contractor <br />in the performance of the daily maintenance tasks including refuse collection, green waste, <br />debris, litter, trash, emptying of trash cans, and litter control. The refuse collected by the <br />Contractor in the performance of these tasks shall be transported to a proper disposal site <br />by the Contractor. <br />5.2.3 No trash, litter, debris, or green waste shall be permitted to be dumped from sites not on <br />this contract, If the contractor is found to abuse the refuse bins, the contractor will assume <br />the responsibility to dispose of and pay for all refuse costs for the remaining terms of the <br />contract. <br />5.2.4 The contractor shall maintain logs or invoices showing Santa Ana address identifying its <br />refuse collection and disposal activities and make those logs or invoices available to the <br />City for inspection on reasonable notice. <br />5.2.5 The contractor will not be required to sort recyclable materials from trash and other refuse <br />collected by the Contractor. Recyclable 'materials are the property of the City. <br />5.3 Hazardous Materials <br />Use of any chemicals or hazardous materials by the Contractor in performing services shall be subject to approval <br />of the City and shall be used in accordance with the manufacturer's directions and specifications. Contractor shall <br />store and dispose of chemicals or hazardous materials in accordance with all laws, rules and regulations on the <br />subject. Contractor shall defend, indemnify and hold harmless the City and its officials and its employees for all <br />claims, demands, damage, causes of action, loss, liability, cost or expense relating to the Contractor's failure to <br />comply with this section. <br />5.4 Sound / Noise Control Requirements <br />Contractor shall comply with all local sound control and noise level rules, regulations and ordinances, specifically <br />Santa Ana Municipal Code 8.80 NOISE, that apply to any work performed pursuant to the Contract. <br />5.4.1 Each internal combustion engine used for any purpose for the work or related to the work <br />shall be equipped with the type of muffler recommended by the manufacturer of such <br />equipment. No internal combustion engine shall be operated without such muffler. <br />5.4.2 The Santa Ana City Council is considering a ban on all fuel -powered leaf blowers. <br />Contractor will not receive additional compensation should such a ban be implemented <br />prior to or after the award of the Contract. <br />5.4.3 Full compensation for conforming to the requirements of this section shall be considered <br />as included in the prices paid for the various Contract items of work involved and no <br />additional compensation will be paid. <br />