My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Quarterly Report for Housing Division Projects and Activities
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
02/20/2024
>
Item 10 - Quarterly Report for Housing Division Projects and Activities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 4:30:41 PM
Creation date
2/28/2024 4:01:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
10
Date
2/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />Page 4 <br />Aug 22 Commence Grading <br />Sep 22 Begin Foundation Construction <br />Oct 22 Framing Ceremony/Framing Construction Begins <br />Jan 23 Roof diaphragm sheathing and exterior sheathing completed <br />Jan 23 Roof sheathing/frame and shear walls Inspection <br />Jan 23 Buildings dried in <br />Jan 23 House wrap and waterproofing <br />Jan 23 Drywall stack complete <br />Jan 23 Exterior Door installation complete <br />Jan 23 Homebuyer outreach and application open <br />Feb 23 Window installation complete <br />Feb 23 Rough in plumbing <br />Feb 23 Rough in electrical <br />Feb 23 Rough in mechanical <br />Feb 23 Rough in fire sprinkler- OCFA <br />Mar 23 MEP Inspection <br />Mar 23 OCFA Inspection <br />Mar 23 Structural/framing complete <br />Mar 23 Structural/framing Inspection <br />Mar 23 Seal exterior penetrations <br />Mar 23 Wood siding started <br />Mar 23 Start exterior wood trim carpentry-ongoing <br />Mar 23 Insulation completion and inspection <br />Mar 23 Drywall hanging <br />Mar 23 Preliminary homebuyer application review <br />May 23 Habitat for Humanity Leaders Build on-site <br />May 23 Re-launchHomebuyer outreach <br />May 23 Interior paint completed <br />Jun 23 Porch-flatwork, interior door installation and cabinetry installation <br />Jul 23 Painting completion <br />Jul 23 Homebuyer application review and selection <br />Jul 23 Gas pressure test inspection <br />Aug 23 Roofs finished <br />Aug 23 Water meter release (Backflow device inspection) <br />Aug 23 Electrical meter release <br />Sep 23 Families income qualified as moderate-income families and meet the City <br />program ratios <br />Sep 23 Street improvements (curbs, asphalt, and ADA ramp) <br />Sep 23 Solar inspection <br />Sep 23 Orange County Fire Authority Final inspection <br />Sep 23 SCE trench inspection <br />Sep 23 Flatwork completed <br />Sep 23 Family Dedication Day Ceremony <br />Oct 23 Construction Completion <br />Nov 23 Police Final Inspection and sign off <br />Nov 23 826-Planning final inspection and sign off
The URL can be used to link to this page
Your browser does not support the video tag.