My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - AA Existing Construction Contract with James W. Fowler Co
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
02/20/2024
>
Item 13 - AA Existing Construction Contract with James W. Fowler Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 4:27:47 PM
Creation date
2/28/2024 4:02:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
13
Date
2/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />REVISED COST ANALYSIS <br />CONSTRUCTION PROJECT NO. 19-6438, 19-6439, 19-6440: SR-55/Ritchey <br />Water Main Improvements <br />Construction Contract $ 5,922,025 <br />Contract Administration, Inspection and Testing $ 230,000 <br />Water Engineering $ 150,000 <br />Contingencies $ 2,097,975 <br />TOTAL ESTIMATED CONSTRUCTION COSTS $ 8,400,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.