My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - City of Santa Ana 2023 General Plan Annual Progress Report_20240313225459475
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
03/19/2024
>
Item 13 - City of Santa Ana 2023 General Plan Annual Progress Report_20240313225459475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 4:22:27 PM
Creation date
3/13/2024 3:57:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
13
Date
3/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-71 <br /> <br />ELEMENT REF # EJ IMPLEMENTATION ACTION AGENCY TIME <br />FRAME 2023 UPDATE <br />Open Space 3.3 No Asset management. Forecast and track <br />facility lifecycle to plan for the ongoing <br />needs for park and landscaping <br />renovations and replacement. <br />PRCSA 2022 & <br />ongoing <br />Utilizing the City's My Santa Ana App to <br />document work orders and launched <br />City Works to track asset management. <br />Open Space 3.4 No Green infrastructure. Identify and apply <br />funds to implement environmental <br />design practices such as integrating and <br />maintaining native plants, additional <br />trees, bioswales, and other natural and <br />green infrastructure into targeted sites <br />to support sustainability, reduced water <br />and maintenance costs, natural resource <br />protection, environmental <br />education/interpretation, and <br />connections to nature <br />PRCSA 2022 & <br />ongoing <br />Continued to practice green design, <br />such as waterwise planting, drip <br />irrigation and stormwater capture and <br />treatment. <br />Public <br />Services <br />1.1 No Equity audit. Conduct an audit of the <br />equitability of where and how public <br />facilities and services are provided <br />throughout the city; develop and <br />implement an action plan to improve the <br />equitability of the provision of public <br />facilities and services based on the <br />findings of the audit. <br />PRCSA/PWA 2023 Through the Parks Master Plan <br />development plan process, an <br />assessment was conducted to <br />determine where to locate public <br />facilities and services throughout the <br />City in an equitable manner.
The URL can be used to link to this page
Your browser does not support the video tag.