My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Agreement with Houston & Harris, PCS, Inc. to Provide Closed Circuit Television
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/02/2024
>
Item 13 - Agreement with Houston & Harris, PCS, Inc. to Provide Closed Circuit Television
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 9:03:33 AM
Creation date
3/27/2024 8:17:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
13
Date
4/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 24-003 <br />CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SANITARY SEWERS <br />b) Date of inspection. <br />c) Database number <br />7. All digital reports shall be in (pdf) format and contain as a minimum the following <br />information: <br />a) Date and time of inspection <br />b) Name of Contractor <br />c) Names of operating technician/inspector <br />d) Pipe size, material, and total length <br />e) Number and street or intersection location and the City designated number for the <br />starting manhole. <br />f) Number and street or intersection location and the City manhole number for the <br />ending manhole. <br />g) Direction of inspection (upstream or downstream). <br />h) The database number. <br />i) NASSCO rating scores including as a minimum: Quick Structural Rating (QSR), <br />Quick Maintenance Rating (QMR), Structural Pipe Rating (SPR), Maintenance <br />Pipe Rating (MPR) and Overall Pipe Rating (OPR). <br />j) Observations, comments, recommendations, laterals referenced to footage <br />counter and video clock (tape counter). <br />k) Pipe segment iWaterlD. <br />8. Each database shall have runs numbered in sequential order starting with one (1). <br />The operator shall proceed to the next run number whenever the camera is withdrawn <br />regardless of the reason, encounters the next manhole, next cleanout or when a run is <br />terminated. Digital video files (one for each run) shall conform to the indexing system <br />with each file being designated by concatenating the database number with the run <br />number (i.e.: 1179-01.WMV would designate the first run on database number 1179). <br />If such naming by the Contractor is found to be technically unfeasible, the Contractor <br />shall deliver the files, along with any tabular information that would be necessary for <br />the City to automate the file naming process. Any file naming convention that does <br />not conform to the aforementioned requirements is subject to prior approval of the <br />City. <br />9. Prior to the commencement of work, the Contractor shall demonstrate to the City the <br />procedures that shall be used for the inputting of City manhole numbers, run numbers, <br />street names, or any other data that is encoded in the video database and how the <br />quality and uniformity of that data will be guaranteed. <br />f. TRAFFIC CONTROL <br />Traffic control for sanitary sewer inspection shall be the responsibility of the Contractor <br />and shall conform to the work Area Traffic Control Handbook (WATCH). Flashing <br />arrow boards shall be used on arterial streets. <br />City of Santa Ana RFP 24-003 <br />Closed Circuit Television (CCTV) Inspection of Sanitary Sewers <br />Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.