Laserfiche WebLink
McDonald’s at 2101 and 2109 E Santa Clara Avenue <br />Item #23 <br />Planning and Building Agency <br />April 2, 2024 <br />Slide 19 <br />CEQA and Fiscal Impact (Cont.) <br />Traffic Impacts <br />•A Transportation Analysis and Vehicles Miles Traveled (VMT) Screening Evaluation was prepared for the proposed project by Urban Crossroads. <br />•The project would incorporate all recommendations provided by the Transportation Analysis. <br />•The project is presumed to result in a less than significant impact for VMT, and thus no further VMT analysis was required and no mitigation measures were required. <br />•The VMT Screening Evaluation was thoroughly peer reviewed by the City’s Traffic Engineer and the City’s CEQA consultant, both which concluded that the VMT Screening Evaluation prepared for the project shows the project is screened out from any full VMT analysis. <br />•With incorporation of all recommendations, the project would not substantially increase traffic hazards or congestion. Nonetheless, the applicant has expressed a willingness to install additional traffic safety enhancements as requested by the City to ensure that traffic circulation patterns are not further impacted or worsened, and ensure that the proposed operations will not be detrimental to the health, safety, or general welfare of persons residing or working in the vicinity.