Laserfiche WebLink
CEQA Peer Review Services CHAMBERS <br />City of Santa Ana <br />GROUP <br />We assume we will receive the following documents prepared by Michael Baker and/or the City. <br />• CEQA Exemption Memorandum and NOE <br />• Air Quality, GHG and Noise Reports <br />• Screening Form verifying the Project is screened out of further Vehicle Miles Traveled (VMT) Analysis <br />CHAMBERS GROUP TEAM RESOURCE AREA REVIEWS <br />REVIEWERS <br />Aesthetics, Light, and Glare <br />Agriculture and Forestry Resources <br />Biological Resources <br />Cultural Resources <br />Geology/Soils <br />Hazards and Hazardous Materials <br />Hydrology and Water Quality <br />Land Use/Planning <br />Chambers Group Mineral Resources <br />Population/Housing <br />Public Services <br />Recreation <br />Transportation/Traffic <br />Tribal Cultural Resources <br />Utilities/Service Systems <br />Wildfire <br />Mandatory Findings of Significance <br />Vista Environmental Air Quality/GHG/Noise <br />Project Management hours have been incorporated into this scope of work. Project Management tasks cover <br />communication and coordination with the City, coordination with staff for completion of impact analysis, and Project <br />progress and budget monitoring. Attendance at any City or public meetings, including Planning Commission and City <br />Council meetings, is not included. Should the Project require further coordination than anticipated, or if attendance at <br />public meetings is requested, Chambers Group can attend on a time and materials basis. <br />Assumptions <br />• This scope does not include any onsite survey, testing, data recovery, analysis, monitoring, reporting, or similar <br />programs. <br />• The cost assumes peer review of documents/reports prepared as noted in the RFP. If any additional technical <br />studies require peer review, or if there are significant changes required after the first round of review, an updated <br />scope and cost will be necessary. <br />• This scope assumes no more than two rounds of review, and one virtual meeting lasting no more than 1 hour to <br />discuss the comments. <br />• This scope assumes that all necessary project information to support the analysis will be received. <br />• If the project description, site plan, or technical studies are revised, any revisions to the comments will be done <br />under a separate estimate. <br />-41M%ow 2 <br />Est CGI Proposal#6429b <br />/IPA 1979 www chambersgroupinc.com <br />