/iLei gMon
<br />FEE SCHEDULE
<br />METHOD $/TEST
<br />REINFORCING STEEL AND PRESTRESSING STRANDS
<br />Reber tensile test, <— up to No. 11 (ASTM A370)................................................
<br />70
<br />Reber tensile test, >— No. 14 & over(ASTMA370)...........................................215
<br />Reber bend test, up to No. 11 (ASTM A370)......................................................70
<br />Reber bend test, i No. 14 & over(ASTMA370)..............................................
<br />215
<br />Resistance butt -welded hoops/bars, tensile test, sup to No.10 (CTM 670)....70
<br />Resistance butt -welded hoops/bars, tensile test, >_ No. 11 & over (CTM 670)...90
<br />Mechanical rebar splice, tensile test, <_ up to No. 11 (CTM 670).......................70
<br />Mechanical rebar splice, slip test, <_ up to No. 11 (CTM 670)...........................AS
<br />Mechanical rebar splice, tensile test, 2No. 14 & over (CTM 670)..................215
<br />Mechanical rebar splice, slip test, > No. 14 & over (CTM 670).......................215
<br />Headed rebar splice, tensile test, <— up to No. 11 (CTM 670)............................70
<br />Headed rebar splice, tensile test, > No. 14 & over (CTM 670) .......................215
<br />Epoxy coated rebar/dowel film thickness (coating) test (ASTM A775/A934).......
<br />50
<br />Epoxy coated rebar/dowel continuity (Holiday) test (ASTM A775/A934).............70
<br />Epoxy coated rebar flexibility/bend test, up to No. 11 (ASTMA775/A934)..........
<br />50
<br />Prestressing wire, tension (ASTM A416).........................................................190
<br />Sample preparation (cutting).........................................................................55
<br />METHOD $/TEST
<br />STREET LIGHTSISIGNALS
<br />LED Luminaires / Signal Modules / Countdown Pedestrian Signal Face
<br />Modules (Caltrans RSS 86)........... ... ..................... ........... ........... .......... ....1,390
<br />SPRAY APPLIED FIREPROOFING
<br />Unit weight (density, ASTM E605)........................................................................
<br />65
<br />FASTENERS I BOLTS I RODS
<br />F3125 GR A307, A325 Bolts, tensile test, <_ up to 1-1X' diameter, plain
<br />(ASTM A370).................................................................................................
<br />70
<br />F3125 GR A307, A325 Bolts, tensile test, <_ up to 1-1/4" diameter,
<br />galvanized (ASTM A370)...............................................................................80
<br />A490 Bolts, tensile test, <_ up to 1-1/4" diameter, plain (ASTM A370)................70
<br />A490 Bolts, tensile test, <_ up to 1-114" diameter, galvanized (ASTM A370)......
<br />80
<br />A593 Bolts, tensile test, <_ up to 1-114" diameter, stainless steel (ASTMA370)...
<br />70
<br />F1554 Bolts, tensile test, <— up to 1-1/4" diameter, plain (ASTMA370)............
<br />110
<br />F1554 Bolts, tensile test, <— up to 1-1/4" diameter, galvanized (ASTMA370)...130
<br />SAMPLETRANSPORT
<br />Pick-up & delivery (weekdays, per trip, <50 mile radius from Leighton office) ...
<br />95
<br />EQUIPMENT LIST
<br />ITEM
<br />$UNIT
<br />1/4 inch Grab plates................................................................................
<br />5 each
<br />1/4 inch Tubing (bonded)....................................................................0.60
<br />foot
<br />114 inch Tubing (single) .................. ................. ...........- ....................0.40
<br />foot
<br />3/8 inch Tubing, clear vinyl................................................................0.60
<br />foot
<br />4-Gas meter (RKI Eagle or similar)/GEM 2000...................................140
<br />day
<br />Air flow meter and purge pump (200 cc/min).........................................55
<br />day
<br />Box of 24 soil drive -sample rings.........................................................130
<br />box
<br />Brasssample tubes...............................................................................11
<br />each
<br />Caution tape (1000-foot roll)..................................................................22
<br />each
<br />Combination lock or padlock.................................................................15
<br />each
<br />Compressed air tank and regulator.......................................................55
<br />day
<br />Concrete coring machine (56-inch-dia)...............................................160
<br />day
<br />Consumables (gloves, rope, soap, tape, etc.).......................................40
<br />day
<br />Coresample boxes................................................................................30
<br />each
<br />Crack monitor Two-Dimensional............................................................30
<br />each
<br />Crack monitor Thee-Dimensional..........................................................40
<br />each
<br />Cutoff saws, reciprocating, electric (Sawzall0).....................................
<br />80 day
<br />D-Meter Walking Floor Profiler ............................................................110
<br />day
<br />Disposablebailers.................................................................................25
<br />each
<br />Disposable bladders..............................................................................20
<br />each
<br />Dissolved oxygen meter........................................................................50
<br />day
<br />DOT 55-gallon containment drum with lid ...... .....................
<br />.................. 85drum
<br />Double -ring infltrometer......................................................................135
<br />day
<br />Dual -stage interface probe....................................................................85
<br />day
<br />Dynamic Cone Penetrometer...........................................................
<br />-,430 day
<br />Generator, portable gasoline fueled, 3,500 watts..................................90
<br />day
<br />Global Positioning System/Laser Range Finder ....................................
<br />80 day
<br />Handauger set......................................................................................90
<br />day
<br />HDPE safety fence (!5100 feet).............................................................
<br />40 roll
<br />Horiba U-51 water quality meter..........................................................135
<br />day
<br />Light tower (towable vertical mast)......................................................150
<br />day
<br />Magnehelicgauge .................................................................................15
<br />day
<br />Manometer............................................................................................25
<br />day
<br />Mileage (will adjust with IRS published rate).....................................0.655
<br />mile
<br />ITEM
<br />$ UNIT
<br />Moisture test kit (excludes labor to perform test, ASTM E1907) ...........65
<br />test
<br />Nuclear moisture and density gauge....................................................88
<br />day
<br />Electrical moisture and density gauge..................................................88
<br />Day
<br />Pachometer...........................................................................................50
<br />day
<br />ParticulateMonitor...............................................................................135
<br />day
<br />pH/Conductivity/Temperature meter......................................................60
<br />day
<br />Photo -Ionization Detector (PID) ...........................................................130
<br />day
<br />Pump, Typhoon 2 or 4 stage.................................................................
<br />55
<br />day
<br />QED bladder pump wIQED control box...............................................175
<br />day
<br />Quire fee — Phase I only......................................................................
<br />250 each
<br />Resistivity field meter and pins............................................................
<br />200
<br />day
<br />Slip / threaded cap, 2-inch or 4-inch diameter, PVC Schedule 40.........
<br />20 each
<br />Slope inclinometer...............................................................................250
<br />day
<br />Soil sampling T-handle (Encore)...........................................................10
<br />day
<br />Soilsampling tripod...............................................................................40
<br />day
<br />Speedy (R) moisture tester....................................................................10
<br />day
<br />Stainlesssteel bailer..............................................................................60
<br />day
<br />Submersible pump with controller.......................................................180
<br />day
<br />Submersible pump/transfer pump,10-25 gpm......................................65
<br />day
<br />Support service truck usage (well installation, etc.)-, ..........................
<br />250
<br />day
<br />Survey/fence stakes..............................................................................10
<br />each
<br />Tedlar@ bags.........................................................................................25
<br />each
<br />Traffic cones (:525)/barricades (single lane)..........................................55
<br />day
<br />Turbidity meter......................................................................................80
<br />day
<br />Tyvek® suit (each)... ..............................................................................
<br />25 each
<br />Vaporsampling box...............................................................................65
<br />day
<br />Vehicle usage (carrying equipment)......................................................20
<br />hour
<br />VelociCalc.............................................................................................40
<br />day
<br />Visqueen (20 x 100 feet) ................................................ - ...................
<br />130
<br />roll
<br />Water level indicator (electronic well sounder) <300 feet deep well ....
<br />100
<br />day
<br />ZIPLEVEL®...........................................................................................40
<br />day
<br />Other specialized geotechnical and environmental testing and monitoring
<br />equipment are available, and priced per site
<br />Fee/2023 www.leightongroup.com Page 3 of 4
<br />
|