My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Agreement with Mark Thomas for the Santa Ana BLvd Grade Seperation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/16/2024
>
Item 18 - Agreement with Mark Thomas for the Santa Ana BLvd Grade Seperation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 3:32:07 PM
Creation date
4/10/2024 3:01:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
4/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r PAGE 2OF5 <br />• Project Location <br />• Grade Crossing Information <br />• Evaluation and Selection Criteria <br />• Safety Benefit <br />• Project Implementation and Management <br />• Environmental Readiness <br />Forms: Mark Thomas will prepare the draft and final forms required for the application, <br />These are anticipated to include: <br />• Standard Form (SF) 424 — Application for Federal Assistance <br />• SF 424A — Budget Information for Non -Construction <br />• SF 424B — Assurances for Non -Construction <br />• FRA F 30 — Certifications Regarding Debarment, Suspension and Other <br />Responsibility Matters, Drug -Free Workplace Requirements and Lobbying <br />• FRA F 251 — Applicant Financial Capability Questionnaire <br />• SF LLL — Disclosure of Lobbying Activities <br />Statement of Work: Four separate documents will be prepared using Microsoft Word <br />templates provided by FRA, which are included in the list below. <br />• Statement of Work <br />• Schedule <br />• Budget <br />• Performance Measures <br />Task 1.2 - TCEP Grant Application <br />Mark Thomas will prepare the narrative responses and forms required for the submission <br />application as described below based upon the 2022 Call for Projects Guidelines. <br />• Cover Letter: Letter from the nominating agency signed by an authorized officer <br />of the agency. <br />• Fact Sheet: Up to two (2) pages describing the project scope, cost, schedule, and <br />benefits (outputs/outcomes), which also includes a brief narrative of how the <br />project would impact Greenhouse Gas Emissions, how the project considers <br />P1B) 4-7-D000 <br />]%I GL r0N pARY,WAY, SUITE 2N <br />-vIr,E.(:A4 6)6 <br />MARXTHOMAS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.