My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 -Appropriation Adjustments and Capital Improvement for Clean California Bus Stop Improvement Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/16/2024
>
Item 14 -Appropriation Adjustments and Capital Improvement for Clean California Bus Stop Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 3:31:59 PM
Creation date
4/10/2024 3:01:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Santa Ana Zoo Stormwater Capture <br />and Diversion Project <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Park Facility <br />LOCATION MAP <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The project features the installation of subsurface stormwater <br />infiltration systems at the Santa Ana Zoo to capture and infiltrate <br />approximately 67 acre-feet per year of stormwater and dry -weather <br />runoff. The project will also include a new urban green space, <br />bioswales, pervious pavement, seating, drought -tolerant <br />landscaping and shade trees, and interpretive signage. <br />PROJECT NEED: <br />Stormwater infiltration provides multiple benefits, including improving <br />water quality, enhancing local water supplies, and reducing flooding. <br />J The project will also feature a new urban green space in the zoo <br />Iparking lot, which will provide recreational benefits to the surrounding <br />community. <br />PROJECT COSTS FY 23124 FY 24/25 FY 25/26 FY 26127 FY 27/28 FY 28129 FY 29/30 <br />Construction 2,336,125 - - - - - - <br />Engineering 250,000 - - - <br />Planning 17,400 - - - <br />TOTAL 2,603,525 - - - - - - <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27128 FY 28/29 FY 29/30 <br />Prop 1 IRWM Grant 2,603,525 - - - - - - <br />TOTAL 2,603,525 - - - <br />DIVISION: <br />Construction Engineering <br />CONTACT: <br />Craig Foster, NPDES Manager <br />DATE: <br />13-Mar-2024 <br />In <br />
The URL can be used to link to this page
Your browser does not support the video tag.