My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Contract to Fleming Environmental, Inc. for the Fire Station 75
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/16/2024
>
Item 22 - Contract to Fleming Environmental, Inc. for the Fire Station 75
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 3:26:23 PM
Creation date
4/10/2024 3:01:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
4/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Underground storage tank removal and the installation of an above <br />ground tank fuel station at Fire Station 75. <br />PROJECT NEED: <br />The underground storage tank is in need of removal due to <br />environmental condition of the subsurface soils in the vicinity of the <br />existing underground tanks. The upgraded fuel systems and tanks will <br />meet South Coast AQMD, with adherence to most recent fire code <br />related to setbacks and existing structures. <br />PROJECT TITLE: <br />Fire Station 75 Above Ground <br />Storage Tank <br />PROJECT CATEGORY: <br />City & Park Facility Improvements <br />Municipal Facilities <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works Parks, Fleet & Facilities Mike Ortiz, Senior Civil Engineer 25-Mar-2024 <br />PROJECT COSTS <br />Total <br />Project <br />Cost FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction 903,833 903,833 ------ <br />Contingency 146,167 146,167 ------ <br />TOTAL 1,050,000 1,050,000 ------ <br />SOURCE OF FUNDS <br />Total <br />Project <br />Cost FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />GENERAL FUND 1,050,000 1,050,000 ------ <br />TOTAL 1,050,000 1,050,000 ------ <br />Exhibit 5
The URL can be used to link to this page
Your browser does not support the video tag.