Laserfiche WebLink
� OF ARV <br />n ti� IBC VISION PLAN 2o18 TRAFFIC STUDY UPDATE - <br />ALTERNATIVES ANALYSIS <br />k'ww� <br />Final <br />volumes, densities, and LOS. Appendix C presents detailed HCS worksheets for ramp analysis. When <br />compared to the Buildout Cumulative With Update scenario, there is one additional deficient location at the <br />Southbound SR-55 Off -Ramp to Baker Street. Impacts on freeway ramps are addressed in Section 3.7 in <br />accordance with the impact criteria agreed to by the City and Caltrans. The deficient ramp locations are: <br />AM Peak Hour: <br />1-5 <br />Northbound <br />• Off -Ramp to Jamboree Road <br />1-405 <br />Northbound <br />• Off -Ramp to Jamboree Road <br />• Off -Ramp to MacArthur Boulevard <br />Southbound <br />• Off -Ramp to Jamboree Road <br />• Off -Ramp to MacArthur Boulevard <br />SR-55 <br />Northbound <br />• Direct On -Ramp from Fair Drive <br />• On -Ramp from Paularino Avenue <br />Southbound <br />• Off -Ramp to Paularino Avenue <br />• Off -Ramp to Dyer Road <br />SR-73 <br />Northbound <br />• Off -Ramp to Birch Street <br />Southbound <br />• Off -Ramp to MacArthur Boulevard <br />• Off -Ramp to Campus Drive <br />PM Peak Hour: <br />1-5 <br />Northbound <br />• Off -Ramp to Jamboree Road <br />Southbound <br />• Direct On -Ramp from Jamboree Road <br />1-405 <br />Northbound <br />• Direct On -Ramp from Bristol Street* <br />• Off -Ramp to Bristol Street <br />Southbound <br />• Off -Ramp to Jamboree Road <br />SR-55 <br />Northbound <br />• Direct On -Ramp from Fair Drive <br />• On -Ramp from Paularino Avenue <br />• Direct On -Ramp from MacArthur Boulevard <br />• On -Ramp from Edinger Avenue <br />• On -Ramp from McFadden Avenue <br />Southbound <br />• Off -Ramp to Victoria Street <br />• Off -Ramp to Baker Street <br />• Off -Ramp to Paularino Avenue <br />SR-73 <br />Northbound <br />• On -Ramp North of University Drive from MacArthur Boulevard <br />• On -Ramp from Jamboree Road <br />• Off -Ramp to Birch Street <br />• On -Ramp from Campus Drive <br />• Off -Ramp to Bear Street <br />Southbound <br />• Off -Ramp to MacArthur Boulevard <br />*Denotes freeway ramp impacts. <br />Figure 3.5 and Figure 3.6 graphically depict the Alternative 2 freeway and ramp deficiencies. <br />Iteris, Inc. 177 <br />