Laserfiche WebLink
s PAGE 2 OF 5 <br />• Project Location <br />• Grade Crossing Information <br />• Evaluation and Selection Criteria <br />• Safety Benefit <br />• Project Implementation and Management <br />• Environmental Readiness <br />Forms: Mark Thomas will prepare the draft and final forms required for the application. <br />These are anticipated to include: <br />• Standard Form (SF) 424 — Application for Federal Assistance <br />• SF 424A— Budget Information for Non -Construction <br />• SF 424E — Assurances for Non -Construction <br />• FRA F 30 — Certifications Regarding Debarment, Suspension and Other <br />Responsibility Matters, Drug -Free Workplace Requirements and Lobbying <br />• FRA F 251 —Applicant Financial Capability Questionnaire <br />• SF LLL— Disclosure of Lobbying Activities <br />Statement of Work: Four separate documents will be prepared using Microsoft Word <br />templates provided by FRA, which are included in the list below. <br />• Statement of Work <br />• Schedule <br />• Budget <br />• Performance Measures <br />Task 1.2 - TCEP Grant Application <br />Mark Thomas will prepare the narrative responses and forms required for the submission <br />application as described below based upon the 2022 Call for Projects Guidelines. <br />• Cover Letter: Letter from the nominating agency signed by an authorized officer <br />of the agency. <br />• Fact Sheet: Up to two (2) pages describing the project scope, cost, schedule, and <br />benefits (outputs/outcomes), which also includes a brief narrative of how the <br />project would impact Greenhouse Gas Emissions, how the project considers <br />�Cgd���sp�®`*�9'u y$V�" �na9iAn9ooe <br />g� fp ,y� M.q ^� 11 �(� �-J 2121ALTON PARKWAY, SUITE 210 <br />I,,INE.CA92606 MARKTHOMAS.COM <br />