Laserfiche WebLink
EXHIBIT 3 <br />May 7, 2024 <br />Page 5 <br />Jan 23 Roof sheathing/frame and shear walls Inspection <br />Jan 23 Buildings dried <br />Jan 23 House wrap and waterproofing <br />Jan 23 Drywall stack complete <br />Jan 23 Exterior Door installation complete <br />Jan 23 Homebuyer outreach and application open <br />Feb 23 Window installation complete <br />Feb 23 Rough in plumbing <br />Feb 23 Rough in electrical <br />Feb 23 Rough in mechanical <br />Feb 23 Rough in fire sprinkler- OCFA <br />Mar 23 MEP Inspection <br />Mar 23 OCFA Inspection <br />Mar 23 Structural/framing complete <br />Mar 23 Structural/framing Inspection <br />Mar 23 Seal exterior penetrations <br />Mar 23 Wood siding started <br />Mar 23 Start exterior wood trim carpentry-ongoing <br />Mar 23 Insulation completion and inspection <br />Mar 23 Drywall hanging <br />Mar 23 Preliminary homebuyer application review <br />May 23 Habitat for Humanity Leaders Build on-site <br />May 23 Re-launchHomebuyer outreach <br />May 23 Interior paint completed <br />Jun 23 Porch-flatwork, interior door installation and cabinetry installation <br />Jul 23 Painting completion <br />Jul 23 Homebuyer application review and selection <br />Jul 23 Gas pressure test inspection <br />Aug 23 Roofs finished <br />Aug 23 Water meter release (Backflow device inspection) <br />Aug 23 Electrical meter release <br />Sep 23 Families income qualified as moderate-income families and meet the City <br />program ratios <br />Sep 23 Street improvements (curbs, asphalt, and ADA ramp) <br />Sep 23 Solar inspection <br />Sep 23 Orange County Fire Authority Final inspection <br />Sep 23 SCE trench inspection