My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Quarterly Report for Housing Division Projects and Activities
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/07/2024
>
Item 13 - Quarterly Report for Housing Division Projects and Activities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2024 12:37:16 PM
Creation date
5/2/2024 5:48:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
13
Date
5/7/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />May 7, 2024 <br />Page 7 <br />Jun 22 Applied to County of Orange for ARPA Funding <br />Jun 22 City of Santa Ana City Council Approval of DBA <br />Jun 22 Awarded County of Orange ARPA Funding <br />Jun 22 Applied for TCAC 9% competitive federal tax credits <br />Sept 22 TCAC Allocation <br />Sept 22 Start Construction Documents, Plan Check and Permitting <br />Jan 23 Closing Kick Off <br />Mar 23 Receive grading permit and building permit ready letter <br />Mar 23 Construction loan closing <br />Mar 23 Pull Permits and start construction <br />Apr 23 Site Demolition <br />Jun 23 Groundbreaking Ceremony <br />Jul 23 Storm drain system complete <br />Aug 23 Concrete footings & Columns Complete <br />Sept 23 Structural Framing on Existing Building Complete <br />Oct 23 Concrete pour ground floor slab on grad complete <br />Nov 23 Podium Complete <br />Dec 23 Framing 2nd Floor Complete <br />Jan 24 Framing Third to Fourth Floors Complete <br />Feb 24 Roof Tiebacks- Installation complete and structural observation done <br />Mar 24 Fire Sprinkler Permit Received HVAC inspection done <br />Apr 24 Roofing Framing Complete <br />Jun 24 Drywall Complete, Switchgear received <br />July 24 Dry In Complete, Lath & Plaster Complete <br />Aug 24 Interior Finishes Complete Permanent Power <br />Sept 24 Exterior Finishes Complete <br />Nov 24 Construction Complete <br />May 25 100% Full occupancy (6 months) <br />FX Residences – 801, 807, 809, and 809 ½ E. Santa Ana Boulevard <br />Jan 19 Council approval for land lease and project funding <br />Jan 19 Submittal of application for NPLH funding <br />Feb 19 Confirm with City staff that project site can yield additional units under <br />existing zoning <br />Mar 19 Revise conceptual drawings for additional five (5) units (17 total units, up <br />from the original 12 units) <br />Mar 19 SNHP funding application submitted to County
The URL can be used to link to this page
Your browser does not support the video tag.