My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Approve Additional Funds in the Amount of $270,000 for the SA-5 Vault Modifications
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 10 - Approve Additional Funds in the Amount of $270,000 for the SA-5 Vault Modifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:08:53 PM
Creation date
5/16/2024 11:29:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
10
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1:440.1 ifw <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECTNO.: 11-6413 <br />SA-5 VAULT MODIFICATIONS <br />BID PRQPOSAt <br />TO; CITY COUNCIL OFTHE CITY OF SANTA ANA <br />FROM: T-F— rol;?r-rts- lnc�- <br />REQUIREMENT, <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work., tit they haveexamined the Contract Doc:uments in its entirely and hereby proposes to furnish <br />all material and do all the work required tocomplete the said work in accordance with said plans, (if <br />any) and the specifications for the unit pAce(s) or lump sum(s) set forth in the frill in schedule: <br />Item! <br />Bid it <br />Unit <br />Qty <br />Unit Price <br />Amount <br />I.* <br />Mob ilizabon/Demobilization <br />2-1 <br />Sheeting, Shoring and <br />1 <br />Trench Protection <br />LS <br />3. <br />Construct Steel Water Main <br />(SA-5 Pliping) <br />Ductile <br />4. <br />Iran Pipe, Water Main <br />LS <br />I <br />South of SA-5 Va u tt) <br />Construct 16-inch Ductile <br />53 <br />Iron Pipe Water.Main <br />LS <br />(North of SA- 5 Va u It) <br />6. <br />Construct Connect[ons to <br />Existing 12"/16Y Mains <br />EA <br />4 <br />0 <br />7, <br />Const ru ct Now Flow ContrO <br />Vau It a nd Appurtenances <br />LS <br />1 <br />Construct ModificaticHis to <br />8, <br />the Existing SA-5 Meter <br />Is <br />vault <br />9. <br />Construct. ElettrfCal and <br />Field Instrumentation <br />LS <br />1 <br />1�a 5-00 <br />10. <br />Fumish Instrumentation and <br />Prm ograming <br />LS <br />V, —0— <br />11. <br />Con st ruct 4-Inch Fire rVice <br />EA <br />1L <br />P-I OFP-16 <br />23A-1 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.