My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Approve Additional Funds in the Amount of $270,000 for the SA-5 Vault Modifications
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 10 - Approve Additional Funds in the Amount of $270,000 for the SA-5 Vault Modifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:08:53 PM
Creation date
5/16/2024 11:29:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
10
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />CITY 4F SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 11-6413 SA-5 Vault Modifications Change Order Number 3 <br />To T.E. Roberts Inc. <br />Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time <br />Change requested by Ill 1Rl if' WC)l AC;FNiC:Y <br />EXTRA WORK AT AGREED PRICE <br />DESCRIPTION <br />Unit <br />Qty <br />Total <br />(Estimate) <br />Engineered Shoring Plans for Options <br />i <br />LS <br />$7,290.00 <br />Submission & Additional MWD requests & Shoring <br />Requirements <br />1 <br />LS <br />$6,500.00 <br />Additional 45 Degree Bends A & B <br />1 <br />LS <br />$8,174.60 <br />Additional Fabrication Per MWD Change <br />1 <br />LS <br />$9,320.00 <br />Abandon Previously Installed Pipeline <br />i <br />LS <br />$5,500.00 <br />Remove & Dispose of Conflicting Concrete <br />1 <br />LS <br />$31,239.00 <br />Remove & Dispose of Conflict Vault <br />1 <br />LS <br />$12,500.00 <br />Line -Item Adjustments to accommodate balance of <br />work <br />l Mobilization <br />1 <br />LS <br />$15,000.00 <br />BI-21 Traffic Control <br />1 <br />LS <br />$3,600.00 <br />BI=27 Dewatering <br />1 <br />LS <br />$4,000.00 <br />Credit for BI$ Construct 4" Bottom Drain Blow -off Assembly <br />1 <br />LS <br />($22,300.00) <br />TOTAL <br />$80,823.60 <br />This is the final cost and full compensation including all labor and materials to complete the <br />modifications for the SA 5 Vault and Pipeline project. No further compensation will be considered <br />after this final Change Order. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.