My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:13:08 PM
Creation date
5/16/2024 11:38:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 2267 <br />Use this rate schedule to identifying staff members' hourly rates, reimbursable expenses and/or <br />rates, mileage and/or travel cost, etc. <br />Description <br />Rate <br />We have a cost sheet attatched that we will use <br />or all rates other than rates above. <br />Please see attatched and if approved we can negotiate <br />further for services and <br />Labor rates, equipment rates not definedin our Cost <br />sheet on an as needed <br />basis <br />Per and SGOPe. <br />prejeGt <br />Pricing shall remain firm when not based on Department of Industrial Relations Prevailing Wage <br />Rate. Any and all requests for pricing adjustments for follow-on contract renewal periods shall be <br />provided no later than sixty (60) days prior to the end of the contract period. Any such proposed <br />price adjustments shall be subjected to prevailing wage requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.