Laserfiche WebLink
5325 East Hunter Avenue, Anaheim CA. 90807 P: 714.579.9555 F: 714.893.5978 <br />© 2019 Outdoor Dimensions, LLC. All Rights Reserved.outdoordimensions.com7) Installation (per job site) <br />a. Deliver needed lifts or equipment to site within 2 days of installation, and to be <br />removed in timely manner after installation complete <br />b. Monument installation: <br />i. Footing(s) will be dug prior to inspection taking roughly about 3-4 days. <br />ii. Once footings are dug, the forms will be set pending inspection to pour <br />concrete, roughly 2 days. <br />iii. After inspection is passed sign will be installed taking roughly 1-2 days. <br />iv. Finally after sign is secured our team will install remaining design features <br />including: brick veneer/rock and cast bronze plaques, roughly taking 3-4 <br />days. <br />b. Digital Display Setup: <br />i. City of Santa Ana content managing team will require to meet with <br />Daktronics Technician, location TBD, to run through short course on content <br />management and uploading.