Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL, <br />PROJECT NO.: 24-6997 <br />LOCAL; STREET PREVENTATIVE MAINTENANCE FY 23-24 <br />Item <br />Description <br />Qty <br />ilnit <br />'Unit Price <br />.Amount <br />15 <br />Adjust Water Valve Frame and Cover to - <br />Finished Grade <br />50 <br />EA <br />$ 1,000.00 <br />50 000.00 <br />, - <br />16 <br />Adjust Sewer and Drainage Manhole to <br />Finished Grade <br />30 <br />EA <br />`$ 735.00 <br />$ 22 050.00 <br />17 <br />Parkway Culvert (STD_ Plan No. 319) <br />1 <br />EA <br />$ 4,900.00 <br />$ 4,900.00 <br />18' <br />,Adjust Survey Monument to Finished Grade <br />30. <br />EA <br />$ <br />$ <br />(Non-Wgll Monument) <br />1,300.00 <br />39,000.00 <br />19 <br />Adjust Survey, Monument to Finished Grade <br />6 <br />EA <br />$ <br />S <br />'(Well Monuments <br />1 500.00 <br />,, <br />9,000,00 <br />20, <br />Protection of Surface Utility Frames and <br />1 <br />LS <br />$ 2 000.00 <br />$ 2,000.00 <br />Covers <br />, <br />21 <br />Furnish and Install Traffic`Loop Type F <br />3 <br />EA <br />$ <br />760.00 <br />2,280.00 <br />22 <br />Furnish and Install Traffic, Loop Type E <br />3 <br />EA <br />$ 734.00 <br />$ 2,202.00 <br />23 <br />Construction Sign <br />2 <br />EA <br />$' 3,300.00 <br />$ 6,600.00 <br />24 <br />Signing and Striping <br />1 <br />LS <br />$ 140,000.00 <br />$ 140,000.00 <br />25 <br />Construction Permit <br />] <br />LS <br />$11,000 <br />$ <br />11,000.00 <br />ADD ALTERNATE 1 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price' <br />Amount <br />26 <br />Unclassified Excavation* <br />20 <br />CY <br />$ 354.00 <br />$ <br />70,800.00 <br />27 <br />AC Pavement* <br />500 <br />TI`1 <br />$ 254.00 <br />$ 127,000.00 <br />28 <br />Cold Mill, <br />21,300 <br />SF <br />$ 1.29 <br />$ 24,477.00 <br />29 <br />Rubberized Emulsion Aggregate Slurry <br />(REAS) Type 11, <br />300 <br />ELT <br />915.00 <br />$ 274,500.00 <br />30 <br />Asphalt Rubber Hot Mix (ARHM} <br />30.0 <br />TN <br />$ <br />244.00 <br />73,200.00 <br />31 <br />Crack Sea] <br />1 <br />LS <br />$ 18,100.00 <br />$ 18,100.00 <br />32 <br />Crushed Miscellaneous Base (CMB)* <br />50 <br />CY <br />$ 114.00 <br />"$ 5,700.00 <br />'P=2 of P 2'0 <br />