My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Orange County Transportation Authority Environmental Cleanup Program
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 25 - Orange County Transportation Authority Environmental Cleanup Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 11:57:57 AM
Creation date
5/16/2024 11:43:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT 1 <br />® <br />17542 E. 17th StreetTustin, CA 92780Phone: 714.665.4559 <br />A114' WIDE SIDE OPENINGCURB INLET CATCH BASIN 81.66AC <br />DUCKBILL BACKFLOW VALVE <br />18" PIPE <br />BMP 6:HYDRODYNAMIC SEPARATOR(PRETREATMENT) <br />3.5' WIDE SIDE OPENINGCURB INLET CATCH BASINDUCKBILL BACKFLOWVALVE <br />24" PIPE <br />BMP 4:6" PIPE BIO-RETENTION BASINW/ NO UNDERDRAIN 2 <br />OPEN CULVERT INLETTO BIO-RETENTION BASIN <br />24" PIPE 6" PIPE <br />6" PIPE <br />6" PIPEBMP 1:UNDERGROUND INFILTRATION SYSTEM 1VOLUME PROVIDED: 34,535-CUFT96" DIA. CMP <br />BMP 3:BIO-RETENTION BASINW/ NO UNDERDRAIN 1VOLUME PROVIDED: 1,194 CU-FT.DETAIL HEREON <br />24" PIPE <br />CURB-O-LET OUTLETFROM BIO-RETENTION BASIN 6" PIPE <br />6" PIPE6" PIPE <br />BMP 5:BIO-RETENTION BASINW/ NO UNDERDRAIN 3 BMP 2:UNDERGROUND INFILTRATION SYSTEM 2VOLUME PROVIDED: 20,248-CUFT60" DIA. CMP <br />SUBMITTAL TYPE <br />A11.0AC CHECKED BY: RKDESIGNED BY: RKDRAWN BY: MO 04/17/24PROJECT NO.CSAN00000004SHEET NO.1 OF 1
The URL can be used to link to this page
Your browser does not support the video tag.